Transformer substation engineering project investment prediction data determination method

A technology for determining engineering projects and methods, applied in the field of determining investment forecast data for substation engineering projects, can solve problems such as difficult control of project engineering investment, harsh natural environment, difficult construction, etc., to support high-quality development and improve accuracy Effect

Pending Publication Date: 2021-03-16
NANJING ELECTRIC POWER ENG DESIGN +2
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Second, the natural environment is harsh, the construction is difficult, and the project investment is difficult to control
Compared with traditional machine learning algorithms, it has the advantages of fast running speed, strong generalization ability, high prediction accuracy, and good robustness. In addition, the model of XGBoost algorithm has high interpretability and can be used for prediction of small samples. It has been widely used in runoff prediction, credit card transaction prediction, fault monitoring and other fields, but it has not been deeply applied in the field of substation project investment prediction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transformer substation engineering project investment prediction data determination method
  • Transformer substation engineering project investment prediction data determination method
  • Transformer substation engineering project investment prediction data determination method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application.

[0036] Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present application. The occurrences of this phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is understood explicitly and implicitly by those skilled in the art that the embodiments described herein can be combined with other embodiment...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a transformer substation engineering project investment prediction data determination method, and the method comprises the steps of building a transformer substation engineering project investment prediction index system, collecting and processing the investment prediction index data of the transformer substation engineering project, and building a transformer substation engineering project investment prediction model based on an XGBoost algorithm; and inputting substation engineering project data into the substation engineering project investment prediction model, accurately determining the substation engineering project investment data according to an output result of the substation engineering project investment prediction model, and establishing a substation engineering project investment prediction index system for the purpose of improving substation engineering investment prediction. The transformer substation project investment prediction model based on the XGBoost is constructed, investment prediction data obtained through the XGBoost prediction model can provide accurate reference data for a decision maker, the optimization assistant decision technology of construction investment prediction is supported, and the problem of coordination of data and accuracy of transformer substation project investment prediction is solved.

Description

technical field [0001] The invention relates to the technical field of substation engineering project investment decision-making, in particular to a method for determining investment forecast data of a substation engineering project. Background technique [0002] Power transmission and transformation project construction is the main content of power infrastructure construction, and it is also the main direction of national grid construction investment. The substation project is a project with relatively complicated investment in power transmission and transformation projects. Investment forecasting is the main task in the early decision-making stage of a substation project. With the healthy, rapid and sustainable development of the economy and the increase in the demand for electricity in the whole society, major power companies have large-scale construction of power generation, transmission, and distribution networks to increase power generation. To meet the growing social ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06N20/20G06Q50/06G06Q40/06
CPCG06Q10/04G06Q10/06393G06N20/20G06Q50/06G06Q40/06Y04S10/50
Inventor 管维亚李国文张旺袁竞峰卢文飞张嘉澍
Owner NANJING ELECTRIC POWER ENG DESIGN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products