41results about How to "High quality development" patented technology

Decentralized data transaction method based on block chain

ActiveCN111402055ASolve untrustworthySolve the central single point of failure problemFinanceDigital data protectionTransaction serviceData provider
The invention discloses a decentralized data transaction method based on blockchain. The method is applied to a big data transaction environment composed of a secret key generation center, a blockchain and an intelligent contract; data summary information collection of a data transaction market is achieved through the blockchain, evaluation information of data use conditions is recorded, and transaction records in data transaction are recorded; data requirements can be issued through the intelligent contract, data required by a data demander is matched and screened, and distribution of data rewards is automatically completed. The problem that a data transaction center is not credible can be solved, ownership and informed rights of a data provider to personal data in transaction are guaranteed, intelligence and high efficiency of the data transaction process are improved, and therefore safe and reliable big data transaction service can be provided for two transaction parties.
Owner:HEFEI UNIV OF TECH

Visualization experiment method for dynamically simulating shale pressing fracture network

The invention discloses a visualization experiment method for dynamically simulating a shale pressing fracture network, and belongs to the technical field of unconventional oil and gas reservoir production increase transformation. The method is characterized by comprising the following steps: a, printing a visualization simulation shale rock sample, and manufacturing a simulation wellbore; b, putting the visualization simulation shale rock sample into a visualized pressing fracture cavity, and then putting the simulation wellbore into an open-hole wellbore; c, applying three-dimensional stressto the visualized pressing fracture cavity through a hydraulic chamber, starting a high-definition video camera to record crack initiation, expansion and extension states of the pressing fracture network under different injection conditions, and collecting displacement and pressure data; d, analyzing test result data to obtain fracture initiation, expansion and extension forms and size parametersunder different pressing fracture modes and different construction parameter conditions. The simulation result can be used for guiding pressing fracture scheme design optimization, field constructiondecision adjustment and post-fracturing quantitative evaluation, and the whole experimental method is simple and easy to operate.
Owner:CHINA NAT PETROLEUM CORP CHUANQING DRILLING ENG CO LTD +1

Aquaculture water quality monitoring and early warning system based on Internet of Things

The invention provides an aquaculture water quality monitoring and early warning system based on Internet of Things. The aquaculture water quality monitoring and early warning system based on Internet of Things includes a water quality monitoring subsystem, a video monitoring subsystem, a cloud database and a cloud controller. The aquaculture water quality monitoring and early warning system based on Internet of Things is characterized by marking the name, position and number of each point to be monitored and the water quality index allowed range value of each point to be monitored on a map; splicing the video image and integrating the video information with the map to form the monitoring video of the whole aquaculture area; marking the real-time data of the water quality index in the monitoring video; and comparing the real-time data of the water quality index with the water quality index allowed range value, and performing early warning when the real-time data of the water quality index exceeds the water quality index allowed range value. The aquaculture water quality monitoring and early warning system based on Internet of Things applies the Internet of Things technology to aquaculture, and enables aquaculture to develop to the trend of large scale, high level and high quality.
Owner:JIANGSU VOCATION & TECHNICAL COLLEGE OF FINANCE & ECONOMICS

Image capturing apparatus, control method of image capturing apparatus, and image processing method

An image capturing apparatus which captures an image of a subject with an image sensor having pixels each including a plurality of areas and generates a RAW image for each of the plurality of areas from a signal generated by the image sensor. The apparatus generates a first RAW image and a second RAW image from the RAW images, generates first image data by performing first development on the first RAW image, generates first RAW image data and second RAW image data by compressing the first RAW image and the second RAW image and performs second development on the first RAW image having a higher processing load than the first development. Second image data is generated by the second development on the first RAW image by using the second RAW image.
Owner:CANON KK

Digital twinborn body construction method for precise monitoring of sunlight greenhouse

The invention provides a digital twinborn body construction method for precise monitoring of a sunlight greenhouse. The digital twinborn body construction method comprises the following three steps that 1, preparation is carried out, and early-stage information is collected and a digital twinborn sunlight greenhouse scheme is formulated; 2, a digital twinborn sunlight greenhouse is constructed, and the digital twinborn sunlight greenhouse comprises a digital process, a standardized process and an intelligent process; and 3, operation maintenance is carried out, and the constructed digital twinborn body is expanded, fed back and optimized. According to the digital twinborn body construction method for precise monitoring of the sunlight greenhouse, automatic real-time acquisition, display and modeling analysis of multi-environment element data can be realized, automatic linkage regulation and control according to an early warning rule are supported, and the effects of improving crop yield, reducing operation and management cost, improving disaster risk resistance, optimizing a management mode and enhancing greenhouse automatic management and control capability are achieved.
Owner:廊坊市气象局

Internet platform system for iron and steel manufacturing industry

The invention provides an Internet platform system for the steel manufacturing industry, and the system comprises: a data source layer which is used for obtaining the data in a steel manufacturing business, and carrying out the edge preprocessing of the data; a cloud base layer which is used for providing virtual equipment and processing and storing the data; a cloud platform layer which is used for providing data modeling, resource management, construction of an iron and steel big data system, development of application software and industrial application of a component library for applying the full life cycle of iron and steel manufacturing; and an application layer which is used for constructing application software based on steel manufacturing and operation scenes, wherein the application software comprises production software, management software, design software and service software. According to the invention, a steel manufacturing process technology is innovatively fused with new-generation information technologies such as the industrial Internet; interconnection and sharing of steel manufacturing and operation data are achieved, the production efficiency of steel enterprises is improved, meanwhile, a novel steel production and manufacturing and service system with total elements, a total industrial chain and a total value chain is built, and the blank of comprehensivemanagement of the current steel manufacturing process is filled up.
Owner:SHANDONG IRON & STEEL CO LTD

Steel truss type track structure of seamless magnetic levitation track panel, and construction method thereof

PendingCN111501432AEnsure high precision construction requirementsReasonable forceRailway tracksTrackwayControl system
The invention discloses a steel truss type track structure of a seamless magnetic levitation track panel. The structure is mainly composed of a steel truss type track panel, a fastener system, a trackbearing table and the like from top to bottom, wherein the steel truss type track panel comprises an induction plate, F-shaped steel, a steel truss sleeper plate, a steel truss side web plate, a steel truss middle web plate and a steel rail, the steel rail is longitudinally welded into a full-length steel rail, and the fastener system locks the full-length steel rail in a longitudinal unlimited buckling mode; and F-shaped guide rails of the adjacent sections in the single steel truss type track panel are closely assembled according to a zero track gap. According to the main design thought ofthe steel truss type track structure, medium-low-speed magnetic levitation track panels are designed in a seamless mode and laid in a seamless track mode; the zero track gap is formed between the track panels, so that a continuous and flat F track suspension detection surface is provided for a suspension gap sensor to the greatest extent, and a suspension control system is ensured not to work across the track gap.
Owner:CHINA RAILWAY MAGLEV TRANSPORTATION INVESTMENT CONSTR CO LTD +1

Desulfurization, denitrification, dust removal and waste heat recovery integrated comprehensive technology for waste gas in furnace

The invention discloses a desulfurization, denitrification, dust removal and waste heat recovery integrated comprehensive technology for waste gas in a furnace. The technology includes the following processes of furnace flue gas, pre-dust removal and pre-desulfurization, in-SCR high-temperature denitrification, dry method desulfurization, a cloth bag dust collector, an induced draft fan and up-to-standard discharge. The technology has the advantages that the domestic glass industry is transformed and upgraded, old and new kinetic energy conversion of the traditional industry is pushed, green manufacturing and high-quality development of enterprises are realized, and certain application and popularization value is realized; super-low discharge is realized, and economy and practicability arehigh.
Owner:SHANDONG JINGYAO GLASS GRP

Transformer substation engineering project investment prediction data determination method

PendingCN112508254AHigh precisionSupport high-quality developmentFinanceEnsemble learningIndex systemPower substation
The invention discloses a transformer substation engineering project investment prediction data determination method, and the method comprises the steps of building a transformer substation engineering project investment prediction index system, collecting and processing the investment prediction index data of the transformer substation engineering project, and building a transformer substation engineering project investment prediction model based on an XGBoost algorithm; and inputting substation engineering project data into the substation engineering project investment prediction model, accurately determining the substation engineering project investment data according to an output result of the substation engineering project investment prediction model, and establishing a substation engineering project investment prediction index system for the purpose of improving substation engineering investment prediction. The transformer substation project investment prediction model based on the XGBoost is constructed, investment prediction data obtained through the XGBoost prediction model can provide accurate reference data for a decision maker, the optimization assistant decision technology of construction investment prediction is supported, and the problem of coordination of data and accuracy of transformer substation project investment prediction is solved.
Owner:NANJING ELECTRIC POWER ENG DESIGN +2

Urban agglomeration comprehensive traffic evaluation method

The invention discloses an urban agglomeration comprehensive traffic evaluation method. The method comprises the following steps: S1, calculating urban agglomeration comprehensive connection strength based on travel connection strength and economic connection strength between cities; s2, calculating comprehensive traffic reachability time among cities based on a grid method, and performing normalization processing; and S3, calculating the coupling degree of the comprehensive connection strength and the comprehensive traffic reachability time, and dividing coupling grades. By adopting the evaluation method, the mutual relation between the comprehensive connection strength and the comprehensive traffic accessibility of the urban agglomeration can be more comprehensively represented, and the high-quality development of the comprehensive traffic of the urban agglomeration is realized.
Owner:CHANGAN UNIV

Steel plate for air conditioner compressor and production method thereof

The invention discloses a steel plate for an air conditioner compressor. The steel plate comprises the following chemical components in percentage by weight: 0.04%-0.075% of C, less than or equal to 0.05% of Si, 0.10%-0.30% of Mn, less than or equal to 0.025% of P, less than or equal to 0.015% of S, 0.01%-0.050% of Als and the balance of Fe and inevitable impurity elements, a stress-strain curve of a steel plate material has a yield platform, and the yield strength is 210-290 MPa. The production process of the steel plate comprises the steps of slab hot continuous rolling, flattening and acid pickling, in the flattening process, a flattening unit adopts a constant rolling force mode, the rolling force is required to be 1400-1700 KN, the inlet tension is 60-80 kN, and the outlet tension is 190-300 kN. The problem that a main shell prepared by a pickling plate for the air conditioner compressor is poor in go gauge is solved, and the main shell preparation requirement and the rotor and stator assembly requirement of the air conditioner compressor are met.
Owner:HANDAN IRON & STEEL GROUP +1

Electric vehicle charging pile charging improvement method based on optimized power distribution network distribution

The invention discloses an electric vehicle charging pile charging improvement method based on optimized power distribution network distribution, and relates to a layered and graded V2G power distribution network which comprises a plurality of transformer substations, a plurality of switching stations and a plurality of ring network stations. According to the method, charging pile information and user trip chain information are collected, the charging states of the electric vehicles are classified, then the V2G power distribution network capacity of each area is calculated, the switching station and the ring network station are configured according to the V2G power distribution network capacity of each area, and the ring network station and the switching station collect and summarize the V2G power distribution network capacity of the electric vehicles to serve as an effective adjustable load of the V2G power distribution network. The improved method provided by the invention has good power supply and user access adaptive capacity, flexible inter-station load transfer and balance capacity and rapid network fault self-healing capacity, and meanwhile, has good economical efficiency and implementability in construction and reconstruction of the power distribution network in a central urban area; and a solid foundation is laid for realizing high-quality development of an electric vehicle V2G power distribution network and building a first-stream energy internet.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Natural gas modular acquisition intelligent management platform

PendingCN113689123ARealize digital intelligent managementIncrease work intensityOffice automationResourcesData acquisitionProcess engineering
The invention discloses a natural gas modular acquisition intelligent management platform, which comprises a management system, a data acquisition module, a data transmission module and a production digital intelligent management application module, and the production digital intelligent management application module, the data acquisition module, the data transmission module and the management system are sequentially connected. Through the platform, comprehensive perception, safety strict control and decision optimization of the natural gas exploratory well pilot production process are realized, comprehensive deepening application of a new digital-intelligent management mode of natural gas pilot production work is promoted, digital-intelligent management of the oil and gas production process is realized, business mode reconstruction and production management transformation are driven, industrial upgrading and value increasing are realized, resources can be optimized, the production cost can be reduced, the production safety can be guaranteed, the management and control capability can be improved, monitoring can be enhanced, fine production can be realized, intelligent management can be realized, and high-quality development can be promoted.
Owner:北京大漠石油工程技术有限公司

Efficient forage grass planting mode for three-planting and three-harvesting in one year in Huang-Huai-Hai plain

ActiveCN111602566AEasy to operateAddressing the demand for high-quality forageFabaceae cultivationCereal cultivationCropping systemBulrush millet
The invention relates to an efficient forage grass planting mode for three-planting and three-harvesting in a year in the Huang-Huai-Hai plain. The following forage grass variety is selected, and thefollowing planting system is established: 1, the forage grass variety is formed by mixed sowing and combination of forage barley, forage millet, common vetch and hairy vetch; and (2) the planting system is as follows: ditching and drill sowing are performed on the forage barley in early spring, stubble-connecting no-tillage drill sowing is performed on the forage millet after the forage barley isharvested, and stubble-connecting no-tillage mixed sowing is performed on the hairy vetch and the common vetch after the forage millet is harvested; and the hairy vetch and the common vetch are subjected to mixed sowing according to the seed weight ratio of 1: 1. A method comprises the following steps of 1, planting and harvesting the forage barley; 2, planting and harvesting the forage millet; 3,performing mixed sowing, planting and harvesting on the hairy vetch and the common vetch. Forage grass can be planted for three times and harvested for three times in a year in the Huang-Huai-Hai plain areas, the requirement of high-quality development of herbivorous animal husbandry in the areas for high-quality forage grass and the income increase of farmers are powerfully supported, and the mode has important application value for high-quality development of agriculture and animal husbandry in China.
Owner:INST OF AGRI RESOURCES & ENVIRONMENT HEBEI ACADEMY OF AGRI & FORESTRY SCI

Power grid material supply chain rating evaluation method

The invention provides a power grid material supply chain rating evaluation method, which comprises the steps of 1, establishing a power grid material supply chain three-level evaluation index system according to a power grid material supply chain management target; and 2, on the basis of the established three-level evaluation index system of the power grid material supply chain, calculating the weight of each index by adopting an analytic hierarchy process, and evaluating the power grid material supply chain according to the sorting of the weight of each index. The power grid material supply chain rating evaluation method provided by the invention is convenient to implement, and can combine the characteristics of the power grid materials and construct the power grid material supply chain evaluation index system by adopting the analytic hierarchy process logic according to the management target of the power grid material supply chain, thereby providing technical support for the evaluation of the power grid material supply chain.
Owner:STATE GRID JIBEI ELECTRIC POWER COMPANY +1

Intelligent torpedo car

PendingCN114082931AMeet the needs of pain pointsHigh quality developmentMelt-holding vesselsElectric machineDrive motor
The invention discloses an intelligent torpedo car. Two permanent magnet direct drive motors are arranged on a driving end walking part of the intelligent torpedo car, a mechanical room is arranged on a driving end maintenance platform, and a super capacitor, a traction converter and the like are arranged in the mechanical room. The super capacitor can supply power to the permanent magnet direct drive motors through the traction converter. The intelligent torpedo car saves energy and is environmentally friendly in the transportation process, the operation is safe and reliable, the pain spot requirements of the majority of iron and steel enterprise users can be practically met, and high-quality development of enterprises is achieved.
Owner:CRRC DALIAN CO LTD

Aquaculture water quality monitoring and early warning system based on Internet of Things

The invention provides an aquaculture water quality monitoring and early warning system based on Internet of Things. The aquaculture water quality monitoring and early warning system based on Internet of Things includes a water quality monitoring subsystem, a video monitoring subsystem, a cloud database and a cloud controller. The aquaculture water quality monitoring and early warning system based on Internet of Things is characterized by marking the name, position and number of each point to be monitored and the water quality index allowed range value of each point to be monitored on a map; splicing the video image and integrating the video information with the map to form the monitoring video of the whole aquaculture area; marking the real-time data of the water quality index in the monitoring video; and comparing the real-time data of the water quality index with the water quality index allowed range value, and performing early warning when the real-time data of the water quality index exceeds the water quality index allowed range value. The aquaculture water quality monitoring and early warning system based on Internet of Things applies the Internet of Things technology to aquaculture, and enables aquaculture to develop to the trend of large scale, high level and high quality.
Owner:JIANGSU VOCATION & TECHNICAL COLLEGE OF FINANCE & ECONOMICS

Intelligent subway comprehensive monitoring system and method

PendingCN113934176AImprove smart operation capabilitiesImprove refined management capabilitiesProgramme controlComputer controlIntegrated monitoringMonitoring system
The invention discloses an intelligent subway comprehensive monitoring system and method, and belongs to the technical field of rail transit. The intelligent subway comprehensive monitoring system comprises an operation control platform subsystem, a plurality of station edge subsystems, a plurality of station operation workstations, a plurality of line dispatching workstations and a line network management workstation. The station edge subsystems collect and process data of the station interface professional system in real time and provide station monitoring pages, and the operation control platform subsystem gathers and processes all data forwarded by the station edge subsystems in real time and provides a line monitoring page, a network monitoring page and an intelligent application page. The station operation work station calls the station monitoring pages and the intelligent application page, the line scheduling work station calls the line monitoring pages, the intelligent application page and the station monitoring page, and the line network management work station calls all monitoring pages and the station monitoring pages. The system has the advantages of simplifying the system structure, reducing the construction cost, improving the operation efficiency and promoting the high-quality development of the rail transit industry.
Owner:SHANGHAI QIAN INTELLIGENT SCI & TECH

Water quality early warning system based on real-time water color monitoring

The invention discloses a water quality early warning system based on real-time water color monitoring. The system comprises a calibration system, a monitoring system, a transmission system and a data system. The calibration system comprises a color calibration plate and a sunshine acquisition camera, is internally provided with a built-in color calibration program and can automatically calibrate after receiving an instruction; the monitoring system monitors water color and water quality change information around the pond throught a common sunshine camera; the transmission system is used for collecting the monitored water color information and transmitting the information to the data center in real time; and the data center classifies the collected water color information, performs comprehensive analysis with an original database, performs water color early warning, and finally publishes a result on a webpage, so that monitoring personnel can browse the webpage, preview the information and perform adjustment through terminal equipment. According to the system and the method, the water quality is judged and early warning adjustment is carried out by monitoring the water color, and the system and the method are suitable for aquaculture, environment monitoring and other industries.
Owner:HOHAI UNIV

Prestressed steel structure tool rod piece system

The invention discloses a prestress steel structure tool rod piece system. The prestress steel structure tool rod piece system comprises an intelligent controller, a software system, a tool rod and a prestress system. Under the condition that the same material is used, the prestressed steel structure tool rod piece system scheme can reduce the material consumption of the structure, so that the structure is designed to be thinner and lighter; the permanent prestress value of the prestress steel structure tool rod piece system is small, long-term adverse stress can be avoided, and the prestress loss changing along with time can be greatly reduced; the prestress steel structure tool rod piece system is a dynamic prestress system and is particularly economical and effective under the condition that the ratio of live load to dead load is high. The high-strength steel is fully utilized, the weight of the steel rod piece is reduced, the strength is improved, and the turnover use of the steel member is improved, so that high-quality development such as energy conservation, environmental protection and construction safety is realized.
Owner:中交世通(重庆)重工有限公司

Ultra-large decoration garbage reducing, bag breaking and feeding all-in-one machine and manufacturing method thereof

The invention provides an ultra-large decoration garbage reducing, bag breaking and feeding all-in-one machine and a manufacturing method thereof. The problem that in China, decoration garbage resource recycling technology and equipment are lack of market urgent needs is solved. According to the creative principle, through an adjustable extrusion method, bag breaking and reducing of the super-large decoration garbage are carried out. According to the ultra-large decoration garbage reducing, bag breaking and feeding all-in-one machine, a super-large block reducing function, a bag breaking function and a lower feeding function are scientifically designed on the same machine. Two roller assemblies of a super-large block reducing and bag breaking system are installed on the same track, the gap between the two roller assemblies is divided into four gears to be adjustable, and an elastic positioning ball and a positioning lead screw are designed on the track; and the adjustable gap meets the complex working condition requirements of overlarge blocks in non-bagged garbage and different sizes of bagged garbage. Spring thrust devices at the rear ends of rollers can enable the gap of the rollers to generate thrust under the action of elastic force, so that the meshing force of the bagged garbage and the super-large garbage during bag breaking and diameter changing is enhanced.
Owner:顺叱华青岛智能科技有限公司

IPC intelligent control system and method

The invention relates to an IPC intelligent control system. The system comprises a data input module which is used for collecting on-site real-time data; a priori knowledge intelligent control module which performs data interaction with the data input module; and an intelligent modeling module connected with the data input module; wherein the intelligent modeling module is configured to control the priori knowledge intelligent control module. The invention also relates to an IPC intelligent control method. The method comprises the following steps of collecting field real-time data; the priori knowledge intelligent control module performing data interaction with field real-time data; and an intelligent modeling module being configured to control the priori knowledge intelligent control module.
Owner:BEIJING CENTURY ROBUST TECH

Ship lock type for silt-laden wandering river

The invention relates to the field of water conservancy projects and channel engineering buildings, and provides a ship lock type for a sediment-laden wandering river, which comprises a port entering channel, an offshore ship lock, an underground channel, an alongside ship lock and a plurality of corresponding flushing and drainage systems, a plurality of gates are used for separation between the port entering channel and the offshore ship lock, between the offshore ship lock and the underground channel, and between the underground channel and the docking ship lock. The entrance channel and the ship lock are separated from the main channel through the gate, so that silt is prevented from entering; lifting of the ship is achieved through the flushing and draining system; on the premise that a river channel is occupied as little as possible, on the basis that the flood discharge section is not affected, the ship enters the port and reaches the shore. Meanwhile, three-beach treatment is considered, and high-quality development of the downstream beach area of the Yellow River is achieved.
Owner:YELLOW RIVER ENG CONSULTING

Preparation method of natural composite fruit powder

A preparation method of natural composite fruit powder comprises the following preparation steps: checking and accepting raw materials: processing and squeezing mulberry fruits, blueberries and waxberries to obtain peel residues, and removing physical impurities in the peel residues; preparing raw materials, comprising mulberry fruits, blueberries and waxberry peel residues according to the weight ratio of (35-50):(25-35):(25-35); uniformly crushing the composite ingredients by using a crusher to preliminarily refine and uniformly mix the composite ingredients; freeze-drying in two stages: wherein in the pre-freezing stage, the material thickness is controlled to be 5-8 mm, the temperature is controlled to be -45 to -50 DEG C, and the time is controlled to be 1.0-1.5 hours, and in the sublimation stage, the thickness of the materials is controlled to be 5-8 mm, the pressure intensity of a drying chamber is 85-90 Pa, the temperature of a heating plate is 60-75 DEG C, and composite pomace is obtained when the moisture of the materials is controlled to be within 6%; pulverization: in an environment with humidity controlled within 30%, pulverizing and refining the freeze-dried composite pomace in the step (4) to obtain powdery composite fruit powder with uniform quality. The natural composite fruit powder is high in raw material utilization rate, rich in nutrition, bright in color, good in rehydration property, easy to store and convenient to eat, and has natural properties of the product.
Owner:ZHEJIANG PHARMA COLLEGE

A gis-based digital steel mill visualization analysis system

ActiveCN112328723BDiscover and avoid hidden dangers in production safetyIncrease productivityData processing applicationsVisual data miningInformatizationData profiling
The invention relates to a GIS-based digital steel mill visualization analysis system, which belongs to the field of information technology. The system includes three modules: data storage background, algorithm service middle station and business application foreground; the data storage background is used to collect, organize, verify, store and distribute the basic attribute data and basic spatial data of the steel plant. , to provide spatial data service support for the algorithm service center and the business application foreground; the algorithm service center is used to accept the data in the data storage background, accumulate business experience, and solidify the method model for upper-level business applications. Provide data analysis services; the business application foreground is used to accept the data and analysis results of the data storage background and the algorithm service middle platform, and combined with specific business application scenarios, it is finally built into different business analysis systems, providing iron and steel business. Serve.
Owner:CISDI ENG CO LTD +1

System for evaluating suitability of cigarette paper and cigarette making machine

The invention discloses a system for evaluating the suitability of cigarette paper and a cigarette making machine, and the system comprises an evaluation index determination module which is used for determining the evaluation index of the suitability of the cigarette paper and the cigarette making machine, and the evaluation index at least comprises the average speed of the cigarette making machine, the average empty head rejection rate data, the cigarette quality defect rate caused by the cigarette paper, and the shutdown frequency; a suitability parameter determination module which is used for determining suitability parameters of the evaluation indexes; and a suitability evaluation module which is used for evaluating each evaluation index according to the suitability parameters. According to the system for evaluating the suitability of the cigarette paper and the cigarette making machine, the evaluation index determination module is used for determining the evaluation indexes of thesuitability of the cigarette paper and the cigarette making machine, and the suitability parameter determination module is used for determining the suitability parameters of all the evaluation indexes, so that the suitability evaluation module evaluates each evaluation index according to the suitability parameters of all the evaluation indexes, so that a scientific evaluation system is provided for the suitability of the cigarette paper and the cigarette making machine.
Owner:CHINA TOBACCO HENAN IND

Tunnel dust removal system and method

The invention discloses a tunnel dust removal system. The system comprises a filter box and a fan box; the inlet end of the filter box is connected with the fan box, the inner wall of the filter box is provided with nozzles which are spirally arranged, the nozzles are connected with a dustfall agent stock bin through a pressurizing pump, a treatment system which can move, and achieve active suction treatment, physical and chemical combination, deep dustfall and purification of air in the tunnel is adopted, the work environment can be improved within the short time, guarantee is provided for rapid construction, and the method is high in work efficiency, high in purification efficiency, low in cost, high in safety, convenient, easy to operate, and wide in application value.
Owner:CHINA RAILWAY NO 5 ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products