Power grid economic dispatching comprehensive evaluation method considering source load uncertainty

An uncertain and economical dispatching technology, applied in the field of power system dispatching, can solve problems such as deviation, economical calculation cannot guarantee reliability and dispatchability requirements, inaccurate calculation of power supply end of power grid, etc., to ensure reliability. , the effect of improving the accuracy

Pending Publication Date: 2021-06-08
EAST INNER MONGOLIA ELECTRIC POWER COMPANY +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The economic dispatching calculation of this kind of power grid focuses on the goal of economic optimization, and a single economical calculation cannot guarantee the reliability and dispatchability requirements of the power grid dispatching process
[0004] In the calculation method of power grid economic dispatch considering prediction error, its uncertainty is expressed partly according to fuzzy theory, but the selection of fuzzy degree is restricted by human subjectivity, which will lead to inevitable deviation, and its subjective deviation will lead to The calculation of the energy supply end is inaccurate, and there will be a certain deviation after combining the economic dispatch of the power grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid economic dispatching comprehensive evaluation method considering source load uncertainty
  • Power grid economic dispatching comprehensive evaluation method considering source load uncertainty
  • Power grid economic dispatching comprehensive evaluation method considering source load uncertainty

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0084] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0085] In this embodiment, a comprehensive evaluation is performed on the economic dispatch of a power grid at a certain time t.

[0086] Such as figure 1 As shown, the comprehensive evaluation method of power grid economic dispatch considering source-load uncertainty of the present invention includes the following steps:

[0087] Step 1: Establish the uncertainty calculation model on the "source" side

[0088] Step 1.1: Output Calculation Considering Wind Turbine Uncertainty

[0089] Wind power generation has strong uncertainty and is affected by wake effects, terrain, installed capacity, and weather. For grid economic dispatch considering source-load uncertainty, accurate description of prediction error is a prerequisite for safe and economic dispatch in energy systems. The uncertainty of wind power generation is represented by the sum of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of power system dispatching, and provides a power grid economic dispatching comprehensive evaluation method considering source load uncertainty, which comprises the following steps: step 1, establishing a source side uncertainty calculation model: calculating actual fan output considering fan uncertainty and actual photovoltaic output considering photovoltaic uncertainty; 2, establishing a load side uncertainty calculation model: respectively calculating an electric load actual value, a gas load actual value and a thermal load actual value considering the uncertainty of the electric load, the gas load and the thermal load; 3, carrying out power grid economic dispatching comprehensive index calculation: calculating a power grid economic dispatching reliability index (power grid average power supply unavailability), an economic index and an undispatchability index (regulation and control accuracy) considering the source load uncertainty, and calculating the power grid economic dispatching comprehensive index considering the source load uncertainty; and 4, carrying out comprehensive evaluation of power grid economic dispatching. According to the invention, the accuracy of power grid economic dispatching evaluation can be improved.

Description

technical field [0001] The invention relates to the technical field of electric power system dispatching, in particular to a comprehensive evaluation method for power grid economic dispatching considering source-load uncertainty. Background technique [0002] As the penetration rate of renewable energy continues to increase, the intermittence and volatility of the source side and the difficulty of forecasting the load side continue to increase. When the source and load prediction errors are too large, it will have a great impact on power grid dispatching. In order to improve the reliability of system operation and improve the operation economy, it is necessary to fully consider the relationship between the prediction error caused by the uncertainty of source and load and the economic dispatch of the power grid. relationship and provide a reasonable basis for improving economic operation. [0003] First of all, in the calculation method of economic dispatching of the power g...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q50/06G06Q10/06
CPCG06Q50/06G06Q10/06393Y04S10/50Y02E40/70
Inventor 张文军胡浩易善军韩玉辉宋昆尹洪全朱宏涛周攀李海琛明德才张晓志陈双刘蒙聪刘绎高刘文胜尚国政戴幸涛张钧贺王祎晨史航周宁顾晓川赵嵩赵鹏宇
Owner EAST INNER MONGOLIA ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products