Hedgehog digging-through prevention structure for bottom of enclosing wall
A fence and hedgehog technology, applied in the direction of fence, application, building structure, etc., can solve the problems of the collapse of the fence, the empty support structure at the bottom of the fence, and the damage of the fence, and achieve the effect of reducing labor costs, good safety, and security.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] An anti-hedgehog digging-through structure for the bottom of the fence, which is arranged on the outside of the wall body 1 of the fence wall. The fence includes a wall body 1, a concrete foundation 2 and a lime-soil solid layer 3, and the lime-soil solid layer 3 and the concrete foundation 2 are all buried in the Under the ground, it includes buried trigger modules, positioning drive modules and pothole filling modules. There are multiple groups of buried trigger modules and positioning drive modules, and each group of trigger modules is electrically connected to its corresponding positioning drive modules. The control box 4 is electrically connected to the pothole filling module. The pothole filling module includes a walking assembly, an automatic concrete making module and a stirring tank turning assembly. The walking assembly includes a walking track 5 and a track flat car 6. The automatic concrete making module includes a water tank 7 and The stirring tank 8, the wa...
Embodiment 2
[0040] An anti-hedgehog digging-through structure for the bottom of a fence, comprising the following steps:
[0041] Step 1: Mark the embedding position of the embedded trigger module outside the wall body 1 of the enclosure, and excavate the embedding pit. The embedding pit is located on the outside of the concrete foundation 2 and the lime-soil solid layer 3, and the depth of the embedding pit is not lower than that of the lime-soil embankment. The depth of the real layer 3 is backfilled and buried after the embedding limit frame 9 is installed and excavated;
[0042] Step 2: Carry out demarcation and setting-out to the outer wall of the wall body 1 of the enclosure, install the traveling track 5 according to the setting-out position, and the channel of the traveling track 5 is reinforced with the wall body 1 through the fixed frame 19 on the track and the fixed frame 18 under the track;
[0043] Step 3, place the fixed frame 10 by embedding the limit frame 9, and fix the p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com