Multi-house water platform
A technology of water platform and connection platform, which is applied to ships, climate change adaptation, floating buildings, etc., can solve the problems of inconvenient leveling and tilting of houseboats, and achieve the effect of rapid adjustment, improved stability and good stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Referring to body 1-5, this embodiment discloses a multi-house water platform, including a corridor 1, a connecting platform 2 and several houseboats 3, guardrails 4 are arranged on both sides of the corridor 1, and the connecting platform 2 has a polygonal structure. 1. One end is connected to the wharf on the shore, the other end is connected to an edge of the connecting platform 2, and the remaining edge positions of the connecting platform 2 are connected to a houseboat 3;
[0037] The bottom of the corridor 1, the connecting platform 2 and the houseboat 3 are all equipped with a buoyancy tank 5;
[0038]The buoyancy adjustment device 6 is arranged in the buoyancy tank 5, and the buoyancy adjustment device 6 includes a water pump 7, a first water inlet pipe 8, a second water inlet pipe 9, a water outlet pipe 10, a first three-way valve 11 and a second three-way valve 12 , the water pump 7 is located at the top of the buoyancy tank 5, the first three-way valve 11 and...
Embodiment 2
[0049] see Figure 4 , this embodiment is further optimized on the basis of Embodiment 1. In this embodiment, a fixing device 18 is provided at the bottom of the connecting platform 2, the houseboat 3 and the corridor 1, and the fixing device 18 is used to fix the connecting platform 2 and the boathouse 3 and the position of the bottom of Corridor 1 in the water area.
[0050] Fixing device 18 comprises four cement weight blocks and anchor cable 19, and four cement weight blocks are respectively the first cement weight block 20, the second cement weight block 21, the third cement weight block 22 and the fourth cement weight block. The weight block 23, the first cement weight block 20, the second cement weight block 21 are located at the front side of the connecting platform 2, the houseboat 3 or the corridor 1, the third cement weight block 22 and the fourth cement weight block 23 are located at Connect the platform 2, the houseboat 3 or the rear side of the corridor 1, the f...
Embodiment 3
[0053] see Image 6 , this embodiment is further optimized on the basis of Embodiment 1. In this embodiment, a sliding assembly 24 is provided on the side of the frame body 13, and the sliding assembly 24 includes a fixing seat 25, an "I" type slide rail 26 and a guide wheel Component 27, fixed seat 25 is used to be fixedly arranged on the cement column in the water area, " I " type slide rail 26 is vertically arranged on the fixed seat 25, and guide wheel assembly 27 is installed on the frame body 13 and with " I " type The slide rails are slidingly engaged with each other.
[0054] Wherein, the fixed seat 25 is fixedly installed on the cement column in the water area through the expansion bolt 28, which can make the installation of the fixed seat 25 more stable.
[0055] Wherein, there are two guide wheel assemblies 27, and the two guide wheel assemblies 27 cooperate with the two slide grooves 32 on the "I" type slide rail 26 respectively.
[0056] Further optimization, th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com