Construction site whole-process monitoring method and system
A construction site and monitoring system technology, applied in the field of whole-process monitoring methods and systems at the construction site, can solve problems affecting construction progress, unqualified construction quality, and affecting project construction progress, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Such as figure 1 As shown, the present embodiment provides a method for monitoring the whole construction site, which specifically includes the following steps:
[0049] Step S101: Obtain 3D data of the construction site, and construct a BIM model of the real-time construction project.
[0050] In specific implementation, radar can be used to collect three-dimensional data of the construction site.
[0051] It can be understood that, in other embodiments, other existing measurement equipment or tools may also be used to collect three-dimensional data of the construction site.
[0052] In addition, those skilled in the art can clearly understand that the BIM model is based on existing software to implement model construction, and its methods and processes belong to the prior art, and will not be described in detail here.
[0053] Step S102: Comparing the BIM model of the real-time construction project with the BIM model after the planned construction is completed, and ...
Embodiment 2
[0077] Such as figure 2 As shown, the present embodiment provides a whole-process monitoring system at the construction site, which specifically includes the following modules:
[0078] Real-time construction BIM model building module, which is used to obtain the three-dimensional data of the construction site and construct the BIM model of the real-time construction project;
[0079] Real-time construction project progress judgment module, which is used to compare the BIM model of the real-time construction project with the BIM model after the planned construction is completed, and judge the progress of the real-time construction project;
[0080] The remaining construction material estimation module is used to obtain the construction project progress and the general material information used in the preset historical time period, fit the relationship between the construction project progress and the general material information, and estimate the remaining construction projec...
Embodiment 3
[0089] This embodiment provides a computer-readable storage medium, on which a computer program is stored, and when the program is executed by a processor, the steps in the method for monitoring the entire construction site as described above are implemented.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com