Construction method of highway subgrade with air-raid shelter
A construction method and technology of air-raid shelters, applied in infrastructure engineering, roads, roads, etc., can solve problems such as lack of implementability, influence of substructure, self-heavy roadbed, etc., to achieve light weight, ensure stability, and high space utilization Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The present embodiment discloses a highway embankment construction method with bomb shelters, the road subgrade soil subgrade and together constitute a light soil subgrade foam, such as Figure 1 - Figure 2 , The construction method comprising the steps of:
[0031] Step 1: Construction of an embankment of soil, the soil road construction method using a conventional road construction method can roadbed, and will not be described in detail.
[0032] Step 2: The soil road base construction 2 is provided for ground handling structure dugout side, load-bearing structures as bomb shelters.
[0033] like image 3 Shown, the base structure comprises a drainage process and backfill layer structure disposed on the backfill layer.
[0034] The backfill layer is made of gravel backfill layer 3, the laying of the gravel from the set level, the bearing capacity to meet the demand. The gravel backfill layer is a cross-sectional U-shaped structure, having an internal construction for a cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com