Job scheduling method and system for airport ground service personnel, computer equipment and storage medium
A technology for service personnel and job scheduling, applied in computing, instruments, data processing applications, etc., can solve problems such as unreasonable scheduling methods, and achieve the effects of avoiding work overload, saving labor costs, and reducing scheduling pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] This embodiment provides a method for scheduling operations of airport ground service personnel, such as figure 2 As shown, the method includes:
[0046] S1: Obtain historical airport scheduling data and flight schedules;
[0047] S2: Pre-schedule the airport ground service personnel based on the airport's historical scheduling data and flight schedule, and generate a pre-scheduling schedule;
[0048] S3: When the flight enters the X meter range of the airport, based on the pre-scheduled schedule, generate an operation schedule;
[0049] S4: Scheduling the airport ground service personnel according to the operation schedule.
[0050] The historical scheduling data of the airport includes: task name, task time window, actual task start time, task completion time, and the number of people required for the task.
[0051] The flight schedule includes: flight number, task number, the earliest start time of the task, the latest end time of the task and the parking positio...
Embodiment 2
[0069] This embodiment provides an airport ground service personnel operation dispatching system, such as Figure 5 As shown, the system includes:
[0070] The data acquisition module is used to acquire historical airport scheduling data and flight schedules;
[0071] The pre-scheduling module, based on the airport's historical scheduling data and flight schedules, pre-schedules the airport ground service personnel and generates a pre-scheduling schedule;
[0072] The operation planning module generates an operation schedule based on the pre-scheduled schedule when the flight enters the range of X meters from the airport;
[0073] The scheduling module is used to schedule the airport ground service personnel according to the operation schedule.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com