A method for evaluating water conservancy planning and construction
A water conservancy and planning technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as inflow of construction materials, poor flexibility of construction plans, lack of authenticity of data information, etc., and achieve the effect of saving time and improving authenticity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Hydropower resource is a kind of renewable energy resource. Hydropower converts water energy into electrical energy without consuming limited mineral resources, and has simple equipment, less operation and staff, low power generation cost and high efficiency, so it is fully developed. Water conservancy projects are of great significance to the development of society, economy and environment.
[0047] refer to figure 1 and figure 2 , for the first embodiment of the present invention, a water conservancy planning and construction evaluation method is provided, including:
[0048] S1: Build a hydraulic dynamic model based on the water conservancy and hydropower project management regulations. It should be noted that the construction of a hydraulic dynamic model includes:
[0049] Based on the water conservancy and hydropower engineering management regulations, obtain the initial survey status, later survey status and survey constraints of the hydraulic engineering cons...
Embodiment 2
[0091] refer to image 3 , is the second embodiment of the present invention, which is different from the first embodiment in that it provides a test verification of a water conservancy planning and construction evaluation method, which specifically includes:
[0092] In order to better verify and explain the technical effect adopted in the method of the present invention, in this embodiment, the traditional artificial on-site real-time survey method and the method of the present invention are selected to be compared and tested, and the test results are compared by means of scientific demonstration to verify the method of the present invention. have real effects.
[0093] The traditional artificial on-site real-time survey method requires a lot of manpower and material resources, and the information lacks authenticity. In order to verify that the method of the present invention has more realistic water conservancy engineering information compared with the traditional method, i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com