Method, device and equipment for evaluating importance degree of construction target of intelligent power distribution network

A technology of smart distribution network and evaluation method, applied in the direction of instruments, data processing applications, information technology support systems, etc., can solve the problem of low utilization rate of smart distribution network equipment, waste of resources, and low reliability requirements of smart distribution network And other issues

Pending Publication Date: 2022-03-04
GUANGDONG POWER GRID CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, in practical applications, areas with low levels of economic development have lower requirements for the reliability of smart distribution networks, and if the smart distribution network is built with high reliability standards, it will lead to the failure of smart distribution network equipment The utilization rate is not high, resulting in waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method, device and equipment for evaluating importance degree of construction target of intelligent power distribution network
  • Method, device and equipment for evaluating importance degree of construction target of intelligent power distribution network
  • Method, device and equipment for evaluating importance degree of construction target of intelligent power distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application.

[0030] At present, during the construction of smart distribution network, the access of new primary equipment such as distributed power supply, flexible load, energy storage equipment, and automation device has improved the flexibility and variability of the operating state of smart distribution network.

[0031] However, at present, the construction of smart distribution network focuses on the specific performance of smart distribution network or the relationship between smart distribution network and status evaluation, such as reliability, security, etc., or operating st...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an importance degree evaluation method, device and equipment for an intelligent power distribution network construction target and a storage medium, and relates to the technical field of intelligent power distribution network construction. The method comprises the following steps: determining a plurality of intelligent power distribution network construction targets corresponding to a target region according to the regional power consumption status of the target region; for each intelligent power distribution network construction target, determining a target grade of the intelligent power distribution network construction target according to multiple evaluation indexes corresponding to the intelligent power distribution network construction target; and according to the target grade of each intelligent power distribution network construction target, determining an importance degree sequence of each intelligent power distribution network construction target, wherein the importance degree sequence represents a construction sequence of each intelligent power distribution network construction target. Therefore, based on the method, in the process of constructing the intelligent power distribution network, the construction sequence of all the intelligent power distribution network construction targets can be determined based on the importance degree of all the intelligent power distribution network construction targets, so that the importance degree of the intelligent power distribution network construction targets can be determined in combination with the current power utilization situation of the region, and the regional weakness can be rapidly supplemented.

Description

technical field [0001] The present application relates to the technical field of smart distribution network construction, in particular to a method, device, equipment and storage medium for evaluating the importance of a smart distribution network construction goal. Background technique [0002] The smart distribution network refers to the power network that receives electric energy from the transmission network or regional power plants, and distributes it locally through power distribution facilities or to various users step by step according to voltage. It plays a role in distributing electric energy in the power system. [0003] At present, in the existing technology, the construction scheme of the smart distribution network generally focuses on the reliability and security of the smart distribution network. Therefore, when evaluating the construction project of the smart distribution network, the reliability and security aspects are evaluated. [0004] However, in pract...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06393G06Q50/06Y04S10/50
Inventor 江健健张雪莹张跃何昌皓曾强唐力则
Owner GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products