Method and device for differentially formulating technical scheme of intelligent power distribution network
A technology of intelligent distribution network and technical scheme, applied in the field of intelligent distribution network, can solve the problems of unsatisfactory power grid construction benefits, different demand for power grid intelligence, and uneven development degree, so as to meet the needs of technical economy and society. Efficiency, economical and practical effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] refer to figure 1 or figure 2 , the invention discloses a method for differentially formulating a technical scheme of an intelligent distribution network, which is applied to the planning and construction of an intelligent distribution network in a planning area, and mainly includes the following steps:
[0065] Step S1, obtaining the urgency levels of several construction goals in the planning area, the urgency levels are divided into N levels; according to the N-level urgency levels, an N-level construction target set is established; wherein, the i-th level construction target set includes the first urgency level to The construction target of the i-th urgent level; N is a natural number greater than or equal to two; i is a natural number less than or equal to N;
[0066] Step S2, obtain several technology types that can be developed in the planning area; obtain the correlation score between each technology type and each construction goal after implementation;
[00...
Embodiment 2
[0192] refer to Figure 6 , the invention discloses a device for differentially formulating a technical solution for an intelligent distribution network, including: a first processing module, a second processing module, a third processing module, and a fourth processing module;
[0193] The first processing module 101 is used to obtain the urgency levels of several construction goals in the planning area, and the urgency levels are divided into N levels; according to the N-level urgency levels, an N-level construction target set is established; wherein, the i-th level construction target The set includes construction targets from the first urgent level to the i-th urgent level; N is a natural number greater than or equal to two; i is a natural number less than or equal to N;
[0194]The second processing module 102 is used to obtain several technology types that can be developed in the planning area; obtain the correlation score between each technology type and each constructi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com