Method for backfilling goaf and supporting roof
A goaf and roof technology, applied in fillings, mining equipment, earthwork drilling, etc., can solve the problems of unavoidable roof collapse, lack of support strength, waste of water resources, etc., to protect groundwater resources and protect land resources. , the effect of protecting the environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1: A method for backfilling gobs and supporting the roof, which includes the following steps in turn: (1): preparation stage: (a), drilling a well from the ground to the roadway, and inserting a Self-weight pressurized pipe, install a valve on the part of the pipe exposed on the ground, and close the gap between the well wall and the pipe: First, drill an 8 cm well from the ground to the middle top of the backfill area, and insert a 1 meter long well into the well Install valves on the part of the pipeline exposed to the ground, and close the gap between the well wall and the pipeline.
[0027] (b) Lay the pressurized fluid delivery pipeline on the top of the roadway, and then distribute the membrane from the arc-shaped top of the roadway: use a hanger to hang the pressurized fluid delivery pipeline with a diameter of 2 cm on the top of the roadway, and then use glue or iron from the arc-shaped top of the roadway. Nail the isolation film. The isolation film ...
Embodiment 2
[0040] Embodiment 2: A method for backfilling gobs and supporting the roof, which includes the following steps in turn: (1): preparation stage: (a), drilling a well from the ground to the roadway, and inserting a Self-weight pressurized pipe, install a valve on the part of the pipe exposed on the ground, and close the gap between the well wall and the pipe: First, drill a 40-centimeter well from the ground to the middle top of the backfill area, and insert a 30-meter-long well into the well Install valves on the part of the pipeline exposed to the ground, and close the gap between the well wall and the pipeline.
[0041] (b) Lay the pressurized fluid delivery pipeline on the top of the roadway, and then distribute the membrane from the arc-shaped top of the roadway: use a hanger to hang the pressurized fluid delivery pipeline with a diameter of 20 cm on the top of the roadway, and then glue or iron it from the arc-shaped top of the roadway. Nail the isolation film. The isolat...
Embodiment 3
[0054] Embodiment 3: A method for backfilling gobs and supporting the roof, which includes the following steps in turn: (1): preparation stage: (a), drilling a well from the ground to the roadway, and inserting a Self-weight pressurized pipe, install a valve on the part of the pipe exposed on the ground, and close the gap between the well wall and the pipe: First, drill a 24 cm well from the ground to the middle top of the backfill area, and insert a 15-meter-long well into the well Install valves on the part of the pipeline exposed to the ground, and close the gap between the well wall and the pipeline.
[0055] (b) Lay the pressurized fluid delivery pipeline on the top of the roadway, and then distribute the membrane from the arc-shaped top of the roadway: use a hanger to hang the pressurized fluid delivery pipeline with a diameter of 10 cm on the top of the roadway, and then use glue or iron from the arc-shaped top of the roadway. Nail the isolation film. The isolation fil...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com