A technology for long tunnels and cold areas, applied in water supply installations, water supply installations, earthwork drilling, etc., it can solve the problems of long time for water leakage investigation and high construction cost, saving pool and pipeline construction, saving pipeline costs, The effect of speeding up construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0010] The examples are intended to illustrate the present invention and not to limit it in any way.
[0011] Take the applicant's construction of the North Tianshan Tunnel as an example:
[0012] (1) Project overview
[0013] The North Tianshan Tunnel is the main tunnel crossing the ridges of the North Tianshan Mountains. It is located in the Zhongshan District of the western section of the North Tianshan Mountains. . The elevation of Yueling Pass is 2780m, the relative height difference is 500~1200m, the exit section 500m is located on the downhill of 1‰, the exit section DK122+413~DK122+850 is on the Montmaral station line (437m), which is double It is a long-span tunnel, and the rest are single-track tunnels.
[0014] The applicant is constructing a production task of 7850m in the exit section of the main hole and 6770m of flat guide. The construction period of the flat guide is 20 months, and the construction period of the main hole is 36 months. Since the exit sectio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap