Air conditioning equipment quening regulate and control management system

A technology of air-conditioning equipment and management system, applied in the direction of heating and ventilation control system, electrical program control, lighting and heating equipment, etc., which can solve problems such as not provided

Inactive Publication Date: 2009-07-29
CHUNGHWA TELECOM CO LTD
View PDF0 Cites 19 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing technology does not provide a solution that can regulate the air conditioning equipment in a scheduled manner according to

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Air conditioning equipment quening regulate and control management system
  • Air conditioning equipment quening regulate and control management system
  • Air conditioning equipment quening regulate and control management system

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0043]Please refer to FIG. 1 , which is a schematic diagram of the application architecture of the first embodiment of the scheduling control management system for air-conditioning equipment of the present invention. In this embodiment, the air-conditioning equipment scheduling control management system of the present invention is used to control the interior of various buildings, especially large-scale business places (such as office buildings, factory buildings, restaurants, hospitals, shopping malls, supermarkets, mass stores, etc.) stores, department stores, theaters, exhibition halls) to regulate the air conditioning equipment 100 in. And the air conditioner 100 is integrated with an air conditioner 1001 , an air conditioner 1002 , a pre-cooling air conditioner 1003 , a blower 1004 and an exhaust fan 1005 . The air conditioner 1001 is used to adjust the temperature of the use environment; the air conditioner 1002 is used to adjust the humidity level of the indoor environm...

no. 2 example

[0055] Please refer to FIG. 2 , which is a schematic diagram of the application architecture of the second embodiment of the air-conditioning equipment scheduling control management system of the present invention. In this embodiment, the air conditioner 100 is the same as the first embodiment. The components of the air-conditioning equipment scheduling control management system of the present invention are also the same as those of the first embodiment.

[0056] The difference from the first embodiment is that in the second embodiment, the air-conditioning equipment scheduling control management system of the present invention further includes a time counting (Counting) module 110 and a date counting module 112 .

[0057] The time counting module 110 is used to receive the setting of the setting module 104 and perform time counting, and provide the counted time to the air-conditioning control device 108, and make the air-conditioning control device 108 according to the time a...

no. 3 example

[0064] Please refer to FIG. 3 , which is a schematic diagram of the application architecture of the second embodiment of the air conditioning equipment scheduling control management system of the present invention. In this embodiment, the air conditioner 100 is the same as the first and second embodiments. The components of the air-conditioning equipment scheduling control management system of the present invention are the same as those of the second embodiment.

[0065] In this embodiment, the database 102 , the setting module 104 , the air conditioner control device 108 , the time counting module 110 and the date counting module 112 are connected to the data processing device 2 . The data processing device 2 has network connection and data transmission functions, and can be connected with the remote air conditioner 100 and the outdoor monitoring unit 106a and the indoor monitoring unit 106b through the network communication system 3, so as to execute the remote air condition...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a system for scheduling regulation management of air conditioning equipment, comprising a database used for memorizing scheduling data, outdoor environment value, indoor environment value, preset indoor environment value and corresponding regulation parameters thereof, a setting module which sets the scheduling, preset indoor environment value and the regulation parameters corresponding to the preset indoor environment value, with the set content being memorized in the database, a monitoring unit which monitors the outdoor environment value and/or the indoor environment value according to the scheduling data, with the monitored outdoor environment value and/or indoor environment value being memorized in the database, and an air conditioner control device which can executes the adjustment and control of the air conditioning equipment according to the scheduling data in the database, the outdoor environment value, the indoor environment data, preset indoor environment value and/or the regulation parameters corresponding to the preset indoor environment value. Therefore, the system can regulate the air conditioning equipment to a suitable use state by the preset scheduling, thus achieving the objective that the air conditioning equipment provides suitable temperature and saving the energy resource.

Description

technical field [0001] The present invention relates to an air-conditioning equipment technology, more precisely, relates to an air-conditioning equipment scheduling control management system combined with a scheduling management mechanism. Background technique [0002] Air-conditioning equipment is widely used and installed in various buildings, especially in large-scale business places (such as office buildings, factory buildings, restaurants, hospitals, shopping malls, supermarkets, mass merchandise stores, department stores, theaters, and exhibition halls). Electrical Equipment. The current air-conditioning equipment usually at least integrates an air-conditioning unit, an air-conditioning unit (Air Handling Unit, AHU), a precooling air-conditioning unit (Precooling Air Handler, PAH), and a blower unit (Fan Coil Unit, FCU). Basically, the function of air conditioning equipment is to adjust the air in a closed indoor space to a comfortable temperature value, and to make ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G05B19/418F24F11/00
Inventor 廖学专黄钧鸿王聪瑞陈建蒝林素芬王余焕
Owner CHUNGHWA TELECOM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products