Filling-reclaiming method for building land in coal mining subsidence areas
A technology for building land and subsidence areas, applied in ground mining, earthwork drilling, underground mining, etc., can solve problems such as slow speed, pollution caused by coal gangue environment, poor encryption effect, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The selection principle of the method of the present invention for the reclamation of building land in the coal mining subsidence area is: (1) do not occupy or occupy as little cultivated land as possible, and make full use of the subsidence abandoned land for reclamation; (2) the reclaimed building land in the subsidence area should be arranged in the The sinking stable area avoids the impact of the residual surface sinking on the buildings; (3) The traffic conditions in the reclamation area are convenient. The principle for determining the elevation of the land for reclamation buildings is: it should be determined according to the terrain conditions around the reclamation area and with full consideration of the flood control and drainage capabilities of the reclamation area. On the premise of selecting a good construction site and determining the elevation of the construction site, follow the steps below:
[0018] ①Construction of dams: Construction of dams in large-s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com