Charged tester for field salt density of portable insulator

A kind of insulator and portable technology, which is applied in the field of portable insulator on-site salt dense live tester, can solve the problems of long test time, test, and unlive test, etc., and achieve the effect of shortening test time, reducing test cost and reducing power failure loss

Active Publication Date: 2014-02-19
STATE GRID TIANJIN ELECTRIC POWER +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current detection method needs to clean the dirt on the equipment, test it with a special instrument in the laboratory, or use a salt dense electrification tester to conduct a power outage on-site test. The main problem of the current detection method is that the test time is long and the live test cannot be performed. , can only be measured when the equipment is powered off, but due to the requirements of equipment operation, some equipment cannot be powered off for many years, so the salt density value test cannot be performed
[0003] The live detection of the pollution status of the external insulation of power transmission and transformation equipment has become a difficult problem in this field. Although there are continuous explorations and researches, the effect is not ideal

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Charged tester for field salt density of portable insulator
  • Charged tester for field salt density of portable insulator
  • Charged tester for field salt density of portable insulator

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0022] A portable insulator on-site salt dense electrification tester, such as figure 1 Or as shown in 2 or 3, it includes a test terminal A and a host part E, and the test terminal further includes a test terminal B, a data processing and control part C, a pressure water tank part D, and the data processing of the test terminal And the control part is connected with the test terminal, receives the acquisition signal of the test terminal, is connected with the pressure water tank part, controls it to inject water to the test terminal, and is wirelessly connected with the host part to receive and send signals; the host The part wirelessly sends the host control signal to the data processing and control part of the test end, and at the same time wirelessly receives the acquisition signal of the data processing and control part for calculation and processing.

[0023] Such as figure 2 As shown, the test terminal B includes a barrel-shaped housing 22, a rotating motor 3, a drive...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a charged tester for field salt density of a portable insulator. The tester consists of a test end, a main body part and a rig part, wherein the test end acquires the surface information of the measured insulator through a temperature test probe and a conductivity test probe, and wirelessly sends the acquired information to the main body part; the main body part calculates and displays the detection result; the main body part wirelessly sends a control instruction to the test end to control the working condition of the test end; and the rig part is used for installing and fixing the front of the tester on the surface of the insulator. The tester achieves charged measurement, reduces outage loss, realizes field measurement, immediately obtains the detection result, greatly shortens detection time and decreases detection cost.

Description

technical field [0001] The invention relates to the external insulation maintenance of the electric power system of the electric power engineering, in particular to a portable on-site salt dense electrification tester for insulators. Background technique [0002] During the operation of the power transmission and transformation equipment in the power system, the pollution of the external insulation of the power transmission and transformation equipment needs to be checked regularly to prevent flashover discharge of the equipment and cause power outages. The current detection method needs to clean the dirt on the equipment, test it with a special instrument in the laboratory, or use a salt dense electrification tester to conduct a power outage on-site test. The main problem of the current detection method is that the test time is long and the live test cannot be performed. , can only be measured when the equipment is powered off, but due to the requirements of equipment opera...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G01N27/04
Inventor 王永福刘宝成吴明雷唐庆华姚英
Owner STATE GRID TIANJIN ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products