Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

146results about How to "Reduce power outage loss" patented technology

Breakdown intelligent classification and positioning method of electric transmission line

The invention discloses a breakdown intelligent classification and positioning method of an electric transmission line. The technical scheme of the breakdown intelligent classification and positioning method of the electric transmission line breakdown is that the advantages of three kinds of technologies of a support vector machine (SVM), self-adaptation nerve fuzzy inferences (SVM) and radial based function (RBF) neural networks are concentrated. The breakdown classifiers and positioners of the SVM, the SVM and the RBF neural networks are designed. Positioning errors, classification accuracy and model operation time are used as evaluation indicators. According to the standard that accuracy is preferred and efficiency is taken into account, intelligent selection of an optimal classifier and an optimal positioner is achieved under different breakdown conditions, and optimal breakdown classification and positioning effect is achieved. Meanwhile breakdown serious extent and repair indicators are designed to evaluate breakdown injury extent and breakdown repair difficulty. The breakdown intelligent classification and positioning method of the electric transmission line effectively improves power supply reliability, reduces outage cost, and meanwhile greatly reduces workload of maintenance personnel and improves working efficiency.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING)

Method for testing electric secondary AC loop

The invention relates to an electric secondary AC circuit detection method which comprises the following steps: before a power plant machine set is started, a low-voltage short-circuit point or a short-circuit bogie is input; three-phase 380 V voltage is added at the high-voltage side of a booster station to form a circuit by means of the impedance of a transformer and a generator; current amplitude and phase are measured through a current detecting apparatus to check polarity and transformation ratio in advance; all current protective directions such as generator differential motion are measured. When a neutral point is not connected, a short-circuit point is made at a high plant transformer low-voltage side, and the three-phase 380 V voltage is added at the neutral point of the generator, thereby realizing overall checkup of a generator AC circuit; then, the three-phase 380 V voltage is converted into one-phase voltage or two-phase voltage to carry out overall checkup of a zero sequence circuit. The detection method can check all CT and PT circuits of a generation-transformer group before power transmission; moreover, all protection directions of the generation-transformer group are checked in advance, thereby saving time and fuel oil along with economical efficiency, environmental protection and safety. The electric secondary AC circuit detection method can check secondary circuits such as the transformer and the bus differential protection of a transformer substation.
Owner:ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +1

Combined traveling wave fault location method of high-voltage overhead line and cable hybrid line

The invention provides a combined traveling wave fault location method of a high-voltage overhead line and cable hybrid line. The method comprises the following steps of: firstly, carrying out fault section selection by using a double-ended principle according to time difference generated when a fault initial traveling wave of the hybrid line arrives at two ends, then carrying out initial fault location by using a single-ended principle, and finally working out an accurate result via the single-ended principle by combining with the time difference generated when the fault initial traveling wave arrives at two sides of the line. The method has the advantages that: the obtained fault location result is the result of the single-ended fault location principle, and the effects of hybrid line length error and accurate time synchronization problem of two sides of the line to the fault location accuracy are eliminated in the fault location by using the double-ended principle so that the accuracy and reliability of the fault location are improved. Therefore, the traveling wave fault location of the high-voltage overhead line and cable hybrid line is realized by using the method, the problem on how to accurately search a fault point position after the hybrid line is in the fault can be reliably solved and the traveling wave fault location method has a good application prospect.
Owner:SHANDONG UNIV OF TECH

On-line detection method of metal oxide arrester insulating property influencing factor

The invention discloses an on-line detection method of a metal oxide arrester insulating property influencing factor. The on-line detection method comprises the following steps of: firstly obtaining total current i x (t) of leakage current from a metal oxide arrester ground downlead, and separating resistive current i r (t) from the total current; calculating a total current amplitude value I x, a resistive current amplitude value I r, fundamental current amplitude value I r 1 in the resistive current and a triple-frequency harmonics electric current amplitude value I r3 in the resistive current; and further calculating an aging coefficient beta of a metal oxide arrester, if the I x is greater than a setting value or the I r is greater than the setting value, judging the insulating property of the metal oxide arrester to be poor, and then forming criteria according to the I r, the I r 1, the I r 3 and beta. The method can exactly distinguish the influencing factor which causes the insulating property of the metal oxide arrester to get poor, is beneficial to shortening power off overhaul time, prolongs the service life of metal oxide, and has very important meanings of reducing power off loss and guaranteeing an electric system to safely and economically operate.
Owner:STATE GRID CORP OF CHINA +1

Power distribution network terminal access method based on IEC61850 standard

The invention relates to the field of power system and automation, in particular to a power distribution network terminal access method based on the IEC61850 standard. The method includes the following steps that (1) a power distribution terminal gets access to a port of a program monitoring UDP networking protocol, and data packages are broadcast, found and registered at regular intervals; (2) whether the correlation function of the power distribution terminal passes audits or not is judged; (3) access to the web service port of the power distribution terminal is carried out, and configuration information of the power distribution terminal is obtained; (4) a point table of measure points is generated from the configuration information; (5) the generated point table of the measure points is applied to a distribution automation system. The whole process of the power distribution network terminal access is automatic without manual intervention, namely the power distribution network terminal is of a plug-and-play type, workload of distribution automation and possibility of error occurrence are greatly reduced, implementation difficulty and implementation cost of the distribution automation are reduced, the construction of the distribution automation is promoted, and working efficiency and working correctness of the distribution automation are improved, so that the level of distribution network automation operation is improved, and outage cost is reduced.
Owner:STATE GRID CORP OF CHINA +3

Power distribution network toughness evaluation method in typhoon weather, storage medium and equipment

PendingCN112001626AQuantification of expected strengthDegree of QuantificationDesign optimisation/simulationResourcesData acquisitionEngineering
The invention discloses a power distribution network toughness three-stage evaluation method in typhoon weather, a storage medium and equipment, and the method comprises: simulating and analyzing theimpact on a power distribution network from a typhoon disaster and the response process of the power distribution network to the typhoon disaster when the typhoon disaster does not happen, and carrying out the statistical calculation of a pre-disaster toughness index of the power distribution network; in the typhoon disaster occurrence process, according to the real-time data returned by the powerdistribution network data acquisition and monitoring control system, calculating the toughness index in the power distribution network disaster; after typhoon departure, acquiring actual data of emergency response and first-aid repair of the power distribution network, and calculating a post-disaster toughness index of the power distribution network; and quantifying the three-stage toughness level of the power distribution network, and quantifying the pre-disaster strength degree, the in-disaster resistance, the post-disaster recovery efficiency and the comprehensive toughness of the power distribution network for dealing with typhoon disasters. The method can be used for guiding power distribution network element reinforcement when typhoon does not occur, emergency control in the typhoondisaster process and power restoration after typhoon disasters, and provides a quantitative basis for system planning, operation scheduling and decision recovery.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Power distribution network data checking method based on international electrotechnical commission (IEC) 61968 standard

The invention relates to the field of power system automation, in particular to a power distribution network data checking method based on the international electrotechnical commission (IEC) 61968 standard. The method is characterized in that a system used by the method comprises a grammar checking module, a semantics checking module and a log module which are sequentially communicated. The method includes the following steps: (1) configuring a checking machine for original data to enable the original data to be applicable to the common information model (CIM) standard used by CIM data; (2) judging whether grammatical mistakes exist in the CIM and writing the grammatical mistakes into the log module; (3) loading in the CIM standard used by the CIM data according to the configured checking machine; (4) judging whether semantics mistakes exist in the CIM model and writing the semantics mistakes into the log module; and (5) outputting an analysis result and a journal. The method improves power distribution network data quality, improves automatic operation level of a power distribution network accordingly, reduces outage cost, and has great social and economical value for safe operation of the power distribution network.
Owner:CHINA ELECTRIC POWER RES INST +1

Pre-disaster first-aid repair personnel pre-deployment method for improving power grid recovery speed

The invention provides a pre-disaster first-aid repair personnel pre-deployment method for improving the power grid recovery speed, which comprises the following steps: 1) after predicting an imminentdisaster, obtaining the fault probability of each element according to a power grid element vulnerability curve in combination with meteorological prediction and the geographic information of a powergrid, and generating a fault scene under the disaster through sequential Monte Carlo simulation; 2) acquiring information of a power grid, a repair team and deployable positions, establishing a two-stage stochastic programming model, formulating a deployment scheme of first-aid repair personnel in the first stage, and performing repair and recovery collaborative optimization according to a faultscene in the second stage to minimize power failure loss; and 3) carrying out decoupling solution on the two-stage stochastic programming model through a Progressive Hedging (PH) algorithm. Accordingto the invention, before the upcoming meteorological disasters are predicted, emergency maintenance personnel are deployed in the key links of the power grid, so that the emergency response capabilityof the power grid after the disasters is improved, the repair of fault elements is accelerated, and reasonable suggestions are provided for the formulation of power grid emergency plans.
Owner:XI AN JIAOTONG UNIV +1

Mountain fire disaster early-warning method for overhead power transmission line

ActiveCN106021666AReliable prediction of spreading processesAssess the risk of outagesForecastingCharacter and pattern recognitionTerrainElectric power system
The invention discloses a mountain fire disaster early-warning method for an overhead power transmission line. The method comprises the steps of A, acquiring and obtaining mountain fire occurrence information by utilizing a monitoring module, wherein the mountain fire occurrence information comprises combustible material characteristics, a terrain factor and a meteorological factor; B, obtaining a mountain fire influence factor in the mountain fire occurrence information, and establishing a relationship through a random forest model for threshold association between a mountain fire and the mountain fire influence factor of the mountain fire; C, performing time-space process modeling of mountain fire spread through a cellular automaton with the capability of simulating a complicated natural disaster time-space evolution process, and determining a cellular conversion rule of the cellular automaton by adopting the random forest model; and D, predicting a mountain fire spread process through a cellular automaton model, estimating time of the mountain fire spread to the overhead line, and assessing the risk of overhead line shutdown in combination with external disaster information and power grid internal characteristics. The method can assist in more effectively handling power system interlocking faults caused by a natural disaster prediction effect, so that economic and personnel loss of a power grid and power utilization units is reduced.
Owner:SICHUAN UNIV

Power distribution automation terminal-oriented topology generation method and system

The invention discloses a power distribution automation terminal-oriented topology generation method. The method comprises the following steps of S1, obtaining basic data: obtaining attribute data of each device in a power distribution network, a geographic map and a schematic diagram of a power grid, represented by vector structures, and various image device data represented by lattice structures from a GIS of the power distribution network by a power distribution automation system master station; S2, analyzing the basic data: analyzing the attribute data of each device by the power distribution automation system master station, distributing and connecting devices through the geographic map and the schematic diagram of the power grid, represented by the vector structures, obtaining a physical connection condition of each device in the power distribution network, obtaining various switch blades in the power distribution network, and finally summarizing and sending the analyzed data to the power distribution automation system master station; and S3, generating a dynamic topology: establishing a topology model for the summarized data by the power distribution automation system master station. The method is simple and convenient to realize, and effectively improves the management efficiency, thereby being suitable for popularization.
Owner:HEBEI NORMAL UNIVERSITY OF SCIENCE AND TECHNOLOGY

Error prevention system and method for secondary system anomaly recognition of substation under multiple associated scenes

ActiveCN108053041ASolve the problem of wrong cast and returnImprove coordination and error prevention capabilitiesData processing applicationsCircuit arrangementsPrimary operationPower grid
The invention belongs to the fields of power secondary system abnormal state recognition and misoperation prevention and particularly relates to an error prevention system and method for secondary system anomaly recognition of a substation under multiple associated scenes. According to the method, based on normalization of substation information description and normalization of an operation process, an integrated error-prevention function and an error prevention strategy are deployed and configured in devices at all levels of a secondary system comprising devices, a station server and a scheduling server, and information modeling and recognition are performed on the running states of the secondary devices and the secondary system in the substation; and meanwhile, before primary operation and secondary operation on the substation, whether the operation can cause a system anomaly or misoperation is judged through rehearsal according to a power grid topological structure and the running setting state of the secondary devices, and if the system anomaly or the misoperation is caused, warning or forbidding or prompting is actively sent out through analysis, error prevention and remedy are performed on the misoperation or the abnormal running state occurring in the system, and therefore forward intervention on field operation and maintenance work is realized.
Owner:STATE GRID LIAONING ELECTRIC POWER RES INST +1

DC line fault protection method based on current converter injection characteristic signal

The invention discloses a DC line fault protection method based on a current converter injection characteristic signal. The method comprises the following steps: step 1: establishing a full-bridge modular multilevel current converter; step 2: when a DC line fault occurs, starting a characteristic signal injection strategy to inject the characteristic signal after a fault clearing strategy is started for a certain time, wherein the characteristic signal injection strategy can generate an identifiable characteristic signal in the line; and step 3, after the characteristic signal injection strategy is started, judging whether the fault exists through wavefront refraction. By adoption of the DC line fault protection method disclosed by the invention, permanent faults and transient faults can be quickly distinguished, when the fault is determined as the permanent fault, the fault distance can be accurately judged, and a function of fast restart of a fast arc-extinguishing fault and the non-start of the permanent fault is achieved; and by adoption of the DC line fault protection method disclosed by the invention, adaptive restart is achieved on a DC overhead line, adaptive identificationof the fault nature and the fast restart of the fast arc-extinguishing fault are achieved, the safe and reliable operation of a DC system is ensured, the power outage loss is reduced, and the directbenefit and the indirect benefit are very significant.
Owner:XI AN JIAOTONG UNIV +2

Power equipment defect management system based on AHP and remote support

The invention provides a power equipment defect management system based on AHP and remote support. The system comprises an onsite data collection system, an integrated data management platform and a fault defect analysis and diagnosis system, and the onsite data collection system is used for collecting onsite operation information, and transmitting the onsite operation information to the integrated data management platform; the integrated data management platform is used for realizing storage and management of comprehensive data, performing analysis and hierarchical evaluation on equipment index data and confirming data credibility, and the comprehensive data comprises substation equipment basic parameters, operation information, historical defect data, historical diagnosis cases, expert information, periodical articles and a standard database; and the fault defect analysis and diagnosis system performs real-time data interaction with the integrated data management platform and is usedfor realizing user remote real-time communication, data query and fault analysis and diagnosis. Expert resources can be fully utilized, the equipment fault defect diagnosis efficiency and accuracy are effectively improved, and the system is of great significance in guaranteeing safe and stable operation of power grid equipment.
Owner:南方电网数字电网集团(海南)有限公司

Multi-channel remote signal test device for ring network cabinet and test method thereof

The invention provides a multi-channel remote signal test device for a ring network cabinet and a test method thereof, and relates to the technical field of remote control signal test. The multi-channel remote signal test device for the ring network cabinet comprises an analog switch module A, an analog switch module 101, an analog switch module 102 and an analog switch module B. The multi-channel remote signal test method for the ring network cabinet comprises the steps of firstly, accessing a tester to the remote control loop of a ring network cabinet DTU; secondly, testing an initial state; thirdly, testing the state; fourthly, capturing and self-maintaining multi-channel remote signals; fifthly, recording a test result and checking the result. According to the invention, the device realizes the multi-channel test and four intervals can be continuously operated. Repeated confirming links are eliminated. Meanwhile, when one part inside the ring network cabinet or the switching-on outlet of the ring network cabinet is in wrong connection, the wrong connection can be directly reflected by the device. Therefore, the field test personnel can check and repair the wrong connection conveniently. Meanwhile, the wiring number is reduced through the standardized primary wiring operation by the device, so that the influence of human factors is reduced to the lowest.
Owner:XINING POWER SUPPLY CO OF STATE GRID QINGHAI ELECTRIC POWER CO +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products