Construction method of offshore tide storage bottom sealing concrete

A technology of back-sealing concrete and construction method, which is applied in the direction of basic structure engineering and construction, and can solve problems affecting the internal quality of back-sealing concrete, and achieve the effects of solving construction technical problems, wide application prospects, and short construction period

Active Publication Date: 2015-01-21
CCCC SHEC FIRST HIGHWAY ENG +2
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in practice, due to the influence of the tide at sea, the height of the water surface fluctuates to a certain extent, so that the concrete elevation of the cap bottom cover also fluctuates relative to the water surface. When the concrete elevation of the cap bottom cover is within the range of tidal fluctuations When the back cover concrete is used for construction, the cementitious material is easy to be lost with the seawater during the tide fluctuation process, which seriously affects the internal quality of the back cover concrete.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of offshore tide storage bottom sealing concrete
  • Construction method of offshore tide storage bottom sealing concrete
  • Construction method of offshore tide storage bottom sealing concrete

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not limit the present invention.

[0016] The picture shows a construction method for sea-storing and sealing concrete. When the tide is high, that is, when the concrete elevation of the cap and the bottom of the cap is higher than the water surface, the capping concrete is poured in two layers: the elevation of the cap and the bottom of the concrete is lower than the water surface. Layer 1, using such as figure 1 , figure 2 The construction process for pouring underwater concrete with the pipe shown; after the concrete strength of the pouring layer whose elevation is lower than the water surface meets the requirements, after the tide recedes, the elevation of the bottom cap concrete of the cap is higher than the pouring layer 2 of the water surface. image 3 The dry p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of offshore tide storage bottom sealing concrete. The construction method specifically comprises the following steps of: pouring bearing platform bottom sealing concrete in two layers during rising tide, namely when the elevation of bearing platform bottom sealing concrete is higher than water surface; using a duct pouring underwater concrete construction process for the concrete layer of which the elevation of the bearing platform bottom sealing concrete is lower than the water surface; and after the strength of the concrete of the pouring layer of which the elevation is higher than the water surface reaches demands and ebb tide, using a dry pouring construction process for the concrete layer of which the elevation of the bearing platform bottom sealing concrete is higher than the water surface. According to the actual conditions of tide, the technical problem of influence of tide on offshore bottom sealing concrete construction is effectively solved by the construction process that the underwater tide storage and dry construction are combined with bottom sealing concrete layered pouring; the construction is easy, convenient and safe, the construction period is good and the effect is good; the construction quality of the bottom sealing concrete is effectively guaranteed; favorable conditions are created for bearing platform dry construction; and the construction method has wide application prospect and excellent reference value for similar projects.

Description

Technical field [0001] The invention relates to the technical field of bridge construction, in particular to a construction method for sea moisture storage and bottom sealing concrete. Background technique [0002] At present, when the concrete elevation of the bottom seal of the offshore platform is below the water surface, the construction technology of underwater concrete pouring is adopted. However, in reality, the height of the water surface fluctuates due to the fluctuation of the sea tide, which makes the concrete elevation of the bottom cap of the platform fluctuate relative to the water surface. When the coagulation elevation of the bottom cap of the cap is within the range of the tide fluctuation When using concrete for the back cover, the cementitious material is easy to lose with the seawater during the rise and fall of the tide, which seriously affects the internal quality of the back cover concrete. Summary of the invention [0003] The purpose of the present invent...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D15/02E02D15/06
Inventor 孙鹏李新形文德安赵军科田新平
Owner CCCC SHEC FIRST HIGHWAY ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products