Train bogie rectifying device
A rectification device and bogie technology, which is applied in the direction of bogie, transportation and packaging, railway car body parts, etc., can solve the problems that the bogie rotation is not explained, difficult to implement, fairing connection is not disclosed, etc., to ensure the overall operation Performance, the effect of not increasing the load
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] 1. The train bogie rectification device includes: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, guide Device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, bogie 9 is covered with a shroud The outer casing 5, the outer casing 5 of the shroud is box-shaped up and down, the front and rear upper sides of the outer casing of the shroud 5 are equipped with shroud wheels 2, and the outer casing of the shroud 5 passes through the shroud The wheel 2 is connected with the guide cover track 1, and the guide cover track 1 is connected with the bottom 6 of the passenger car box; the shell frame 3 is connected inside the guide cover outer shell 5. The shroud outer casing 5 is box-shaped up and down, which is convenient for heat dissipation during braking; the sliding connection of the shroud wheel 2 and the ...
Embodiment 2
[0035] 1. The train bogie rectification device includes: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, guide Device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, bogie 9 is covered with a shroud The outer casing 5, the outer casing 5 of the shroud is box-shaped up and down, the front and rear upper sides of the outer casing of the shroud 5 are equipped with shroud wheels 2, and the outer casing of the shroud 5 passes through the shroud The wheel 2 is connected with the guide cover track 1, and the guide cover track 1 is connected with the bottom 6 of the passenger car box; the shell frame 3 is connected inside the guide cover outer shell 5.
[0036] 2. As for the spinner housing 5 in the train bogie rectification device, the front and back of the spinner housing 5 are arc-shaped surfaces, and the two ...
Embodiment 3
[0041] 1. The train bogie rectification device includes: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, guide Device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, bogie 9 is covered with a shroud The outer casing 5, the outer casing 5 of the shroud is box-shaped up and down, the front and rear upper sides of the outer casing of the shroud 5 are equipped with shroud wheels 2, and the outer casing of the shroud 5 passes through the shroud The wheel 2 is connected with the guide cover track 1, and the guide cover track 1 is connected with the bottom 6 of the passenger car box; the shell frame 3 is connected inside the cover outer shell 5 of the guide cover.
[0042] 2. The outer casing 5 of the spinner in the rectifying device of the train bogie is connected to the casing frame 3 by internal welding. The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com