Method for planting paspalum distichum on lead zinc ore tailing
A biscarpa paspalum and tailings technology, which is applied in the field of biscaria paspalum planting, can solve problems such as high sulfate content and water resource pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Carry out the plantation of bispinus paspalum of the present invention in Guangdong Fankou lead-zinc mine tailings pond, carry out according to the following steps:
[0016] (1) Surface treatment of tailings: In March, the surface layer of the tailings was plowed at a depth of 15 cm. After measuring its acidity, pH=1, so the amount of borax applied to the tailings was 5 kg per square meter when plowing. Mine surface, and mix borax and tailings evenly by plowing, then place the plowed tailings for 3 days, and then level the tailings surface;
[0017] (2) Sowing: Open a ditch with a depth of 5 cm on the surface of the leveled tailings, with a row spacing of 30 cm, sprinkle the paspalum seeds in the ditch, fill it with tailings sand, and pour a sufficient amount of water;
[0018] (3) Daily management of paspalum biscarpa: water every 5 days from sowing paspalum biscarina seedlings to seedlings unearthed, usually about 20 days after seedlings emerge, and water once paspalu...
Embodiment 2
[0023] Carry out the plantation of bispinus paspalum of the present invention in Guangdong Fankou lead-zinc mine tailings pond, carry out according to the following steps:
[0024] (1) Surface treatment of tailings: In March, the surface layer of tailings was plowed at a depth of 15 cm. After measuring its acidity, pH=2, so borax was applied to the tailings according to the amount of 3 kg per square meter when plowing. Mine surface, and mix borax and tailings evenly by plowing, then place the plowed tailings for 3 days, and then level the tailings surface;
[0025] (2) Sowing: Open a ditch with a depth of 5 cm on the surface of the leveled tailings, with a row spacing of 30 cm, sprinkle the paspalum seeds in the ditch, fill it with tailings sand, and pour a sufficient amount of water;
[0026] (3) Daily management of paspalum biscarpa: water every 5 days from sowing paspalum biscarina to seedling unearthed, and the seedlings usually emerge in about 20 days. human intervention...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com