Keel connecting piece for building modular clean operating room

A modular, operating room technology, applied in the direction of architecture, building structure, etc., can solve the problem of difficulty in guaranteeing the overall quality level, and achieve the effect of reducing the impact of product quality and improving technical quality.

CN103031891BActive Publication Date: 2015-07-15JIANGSU JIUXIN MEDICAL TECHNOLOGY CO LTD
8 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2015-07-15

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a keel connecting piece for building a modular clean operating room. The keel connecting piece comprises angle joint pieces, riveting pieces and hooking pieces, wherein keels are connected with each other through the angle joint pieces; the keels are fixedly connected with wall plates through the riveting pieces; and the keels are fixedly connected with top plates through the hooking pieces. Due to the arrangement of three types of standard connecting pieces, all products of the entire modular clean operating room can be produced in a plant; and processing is performed on a workshop professional production line, so that the technical quality of the entire process is improved greatly.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a keel connector for building a modular clean operating room. Background technique

[0002] At present, there are many professional manufacturers in the design and construction of clean operating rooms in China, and the level of construction technology is uneven, but they can be generally classified into two types, one is on-site assembly type, and the other is on-site welding type. Both processes are to partially process the product inside the manufacturer, and then the construction team performs secondary processing on site to achieve the purpose of the finished product. Due to the complex and harsh environment of the construction site, it is difficult to guarantee the overall quality level when the product is subjected to secondary processing on site. The construction level of foreign operating rooms is relatively high. At present, these two types of construction techniques have gradually been replaced by overall modular te...

Examples

Embodiment 1

[0029] This embodiment includes a corner joint piece 1 , a riveting piece 2 and a hook piece 3 .

[0030] See figure 1 , when the two keels 4 are fixedly connected, the corner joint 1 is fixedly connected with the two keels 4 through the threaded fastener 7 .

[0031] See figure 2 and image 3 , The longitudinal section of the corner joint 1 is equilateral and right-angled. Both sides of the corner joint 1 are provided with guide flanges 11 . The width and thickness of guide flanging 11 are all matched with keel 4. Both sides of the corner joint 1 are provided with oblong positioning holes 12 .

[0032] See Figure 4 , when the wallboard 5 is fixedly connected to the keel 4, the wallboard 5 is fixedly connected to the riveting part 2 through the rivet 8, and the riveting part 2 is fixedly connected to the keel 4 through the threaded fastener 7.

[0033] See Figure 5 and Figure 6 , the longitudinal section of the riveting piece 2 is in a right-angle Z shape. One ho...