Connection method of main reinforcement of constructional column of infilled wall and framed girder

A connection method and a technology of frame beams, which are applied in building construction, processing of building materials, construction, etc., can solve problems such as inability to overlap, concrete grout leakage, and difficult formwork removal, so as to simplify construction difficulty, improve construction efficiency, The effect of reducing construction costs

Active Publication Date: 2013-06-19
CHINA HUAYE GROUP
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In view of the above problems, the purpose of the present invention is to provide a method for connecting the main reinforcement of the structural column of the filled wall to the frame beam, so as to solve the problems of concrete grout leakage, difficulty in form removal, inaccurate position of the main reinforcement of the frame beam, inability to overlap, tower shape, and planting reinforcement. Loosening, reinforcement deformation and other quality problems that affect the structure of the structural column, and while ensuring the construction quality of the structural column, simplify the construction difficulty, improve efficiency, save steel, and reduce construction costs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Connection method of main reinforcement of constructional column of infilled wall and framed girder
  • Connection method of main reinforcement of constructional column of infilled wall and framed girder
  • Connection method of main reinforcement of constructional column of infilled wall and framed girder

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0029] Aiming at the problems in the aforementioned prior art that the connection mode of the main reinforcement of the structural column of the filled wall and the frame beam affects the force of the structural column structure, wastes the steel bars and increases the construction cost, the present invention connects the structural column of the filled wall with a pre-embedded PVC pipe Main reinforcement and frame beam to solve the quality problems affecting the structural column structure such as concrete grout leakage, difficulty in form removal, inaccurate position of main reinforcement of frame beam, inability to overlap, tower shape, loose planting reinforcement, and deformation of steel reinforcement.

[0030] figure 1 A schematic flowchart of a method for connecting the main reinforcement of an infill wall construction column and a fra...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a connection method of main reinforcement of a constructional column of an infilled wall and a framed girder. After the pattern plates of the framed column are arranged in a supporting mode and the reinforcing steel bars of the framed girder are installed, polyvinyl chloride (PVC) pipes are pre-buried in the intersecting portion of the main reinforcement of the constructional column and the framed girder, the PVC pipes are fixedly connected with the main reinforcement of the constructional column, and then the PVC pipes are fixedly connected with stirrups of the framed girder. The connection method of the main reinforcement of the constructional column of the infilled wall and the framed girder effectively solves the quality problems that concrete leaks, the moldboards are difficult to dismount, the position of the framed girder is inaccurate and incapable of being overlapped, turriform and embedded steel bars are loose, reinforcing steel bars deform and other problems influencing the structure of the constructional column, guarantees the construction quality of the constructional column, and meanwhile is simple and convenient to construct and high in efficiency, saves steel and reduces construction cost.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a method for connecting the main reinforcement of a structural column of a filled wall and a frame beam. Background technique [0002] In the construction of the secondary enclosure structure of the building, in order to increase the stability of the wall and the integrity of the structure, the main reinforcement of the structural column of the infill wall should be connected with the frame beam. When the main reinforcement of the structural column of the infill wall is connected with the frame beam, the traditional method generally adopts two methods: pre-inserted reinforcement and post-planted reinforcement. [0003] When pre-inserted reinforcement is adopted, the bottom formwork of the frame beam must be drilled or opened, which not only easily causes concrete grout leakage, but also causes great difficulty in later formwork removal. [0004] When the post-plant...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G21/02
Inventor 楚军田申连喜
Owner CHINA HUAYE GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products