Pipe pile leading-hole construction method under boulder cluster geological condition

A technology of geological conditions and construction methods, applied in drilling equipment and methods, earthwork drilling, drilling equipment, etc., can solve problems such as inability to penetrate rocks, increased construction costs, rapid wear of drilling tools, etc., and achieve a wide range of strata applications. , Flexible drilling ability, the effect of preventing buried drilling phenomenon

Active Publication Date: 2013-09-04
二十二冶集团天津建设有限公司
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, rotary drilling rigs, impact hammers, reverse circulation drilling rigs, and full-casing full-rotary drilling rigs are commonly used in the construction of pipe pile pilot holes. The shortcomings of insecure quality and complex construction system, especially the soil removal capacity of traditional drilling machines completely depend on the air flow of the air compressor. To enhance the soil removal capacity, a larger air compressor must be configured, resulting in increased construction costs
For the geological conditions of the boulder group, the traditional construction of static pressure prefabricated pipe piles cannot penetrate the rock, and the traditional blasting method cannot be used, nor can the manual digging method be used.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pipe pile leading-hole construction method under boulder cluster geological condition
  • Pipe pile leading-hole construction method under boulder cluster geological condition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] The present invention will be further described below in conjunction with the accompanying drawings and embodiments, and the purpose is only to better understand the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0010] see figure 1 , the pipe pile lead hole construction method under the geological conditions of the boulder group described in the present embodiment is carried out according to the following steps:

[0011] ⑴Measurement positioning:

[0012] Based on the coordinate measurement control point set by the owner in the field area as the benchmark, the center pile of each group of piles and the piles of any pile coaxial with the center pile are released one by one through coordinate conversion, rotation angle, distance measurement, and fixed point by using the range finder. The other pile positions of each group of piles are released one by one with a steel tape using the released ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a pipe pile construction method, in particular to a pipe pile leading-hole construction method under the boulder cluster geological condition. The pipe pile leading-hole construction method adopts a down-hole hammer drilling process, and dilled muck is forcibly discharged out through a spiral drill rod in a rotation mode and is completely removed by utilizing strong wind. The down-hole hammer drilling hole bottom is cleaned through air pressure for 2-3minutes and sediments are removed with lifting of the spiral drill rod after the depth of a drill hole reaches to the designed depth, and operation is stopped after detection shows that the hole depth and the sediment thickness are smaller than or equal to 50mm and meet the design requirements. When the sediment thickness is larger than 50mm, a down-hole hammer is put into the hole again to perform secondary hole cleaning till the actual requirement is met. The pipe pile leading-hole construction method under the boulder cluster geological condition is short in construction period, the construction cost can be saved by more than 10% under the same operating conditions, a stratum application range is wide, and the pipe pile leading-hole construction method is especially suitable for construction of landslide, instability and other complicated stratums. The pipe pile leading-hole construction method is strong in machine tool selectivity and low in field requirement and is especially suitable for mountains and other narrow and small fields.

Description

technical field [0001] The invention relates to a pipe pile construction method, in particular to a pipe pile lead hole construction method under the geological condition of a boulder group. Background technique [0002] At present, rotary drilling rigs, impact hammers, reverse circulation drilling rigs, and full-casing full-rotary drilling rigs are commonly used in the construction of pipe pile pilot holes. The shortcomings of insecure quality and complex construction system, especially the soil removal capacity of traditional drilling machines are completely dependent on the air flow of the air compressor. To enhance the soil removal capacity, a larger air compressor must be configured, resulting in increased construction costs. For the geological conditions of the boulder group, the traditional static pressure prefabricated pipe piles cannot penetrate the rock, the traditional blasting method cannot be used, and the manual digging method cannot be used. Contents of the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B1/00E21B7/04E21B21/16
Inventor 黄修振曲建华姚东森朱文革王滨
Owner 二十二冶集团天津建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products