Rice stubble spring potato furrow-expanding hilling straw furrow-burying improved plow pan
A technology for spring potato and plough bottom layer, which is applied to the cultivation field of rice stubble spring potato expanding ditch, soil stalk burying ditch to improve the plough bottom layer, can solve the problems of labor and time, straw can not be returned to the field, and the covering soil layer is thin, etc. The effect of reducing the number of weeding times in cultivating
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] The following steps are taken for the cultivation method of rice stubble spring potato expansion ditch backed up soil straw burying ditch improvement plow bottom of soil living mud field block.
[0030] A) Ditch digging. After the autumn harvest, dig a field-shaped or well-shaped ditch in the live mud field, dredge the drainage ditch outside the field, reduce the water level in the field, and make the paddy field dry and suitable for farming.
[0031] B) To make a furrow, the width of the furrow is 100cm, and the width of the furrow is 40cm. Plow on both sides of a furrow. The soil block from the furrow is 20cm wide and 13cm thick.
[0032] C) Deep furrows, deep furrows in time after making furrows, hoe the furrows to 25cm below the field surface, and move the soil blocks in the furrows at the same time, stack them into 30cm wide soil ridges, and form two 15cm wide soil ridges with the edge of the furrow , 13cm deep seeding ditch.
[0033] D) Base fertilizer, apply the...
Embodiment 2
[0040] The following steps are taken to improve the plow bottom cultivation method of rice stubble and spring potato with topdressing farm miscellaneous manure, expanding ditch, burying ditch and burying ditch.
[0041] A) Make furrows, from mid-to-late November to early-to-mid-December after the end of autumn harvest and autumn planting, stake out ditches to make furrows on the rice stubble fields. The furrow surface is 100cm wide, and the furrow width is 40cm. Both sides of a furrow are plowed. The soil block from the furrow is 20cm wide and 13cm thick. Plow neatly on the edge of the furrow to form a 13cm high soil ridge.
[0042] B) Deep furrows, deep furrows in time after making furrows, hoe the furrows deep to 25cm below the field surface, move the soil blocks in the furrows at the same time, stack them into 30cm wide soil ridges, and form two 15cm wide soil ridges with the edge of the furrow , 13cm deep seeding ditch.
[0043] C) Base fertilizer, apply the fertilizer in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com