Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Full chain budget data processing system and method for production infrastructure standard cost system

A technology of budget data and processing system, which is applied in the field of full-chain budget data processing system, can solve the problem of no project warning threshold configuration, etc., and achieve the effect of improving scientificity and preparation efficiency

Inactive Publication Date: 2014-03-26
STATE GRID CORP OF CHINA +1
View PDF4 Cites 25 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] There is no project warning threshold configuration in the existing technology, and it is impossible to avoid problems such as abnormalities in the analysis data

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full chain budget data processing system and method for production infrastructure standard cost system
  • Full chain budget data processing system and method for production infrastructure standard cost system
  • Full chain budget data processing system and method for production infrastructure standard cost system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0182] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0183] Such as figure 1 , figure 2 , Figure 2.1 , Figure 2.2 , Figure 2.3 as shown,

[0184] (1) Calculation of substation standard data

[0185] 1) Input the core parameters of the substation project, such as voltage level, power distribution device, capacitance capacity, the number of main transformers in the current period, and the number of long-term main transformers. 2) The system judges the voltage level and locates the standard scheme under the corresponding voltage level in the standard library. 3) Traverse each standard scheme. 4) For each scheme, match each core parameter one by one, and analyze its matching degree. 5) According to the preset matching weight of each parameter, record the matching score of the parameter in the plan, and record the total score of the plan. 6) Summarize to obtain the final score of each scheme. 7) Ge...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a full chain budget data processing system and method for a production infrastructure standard cost system. The budget data processing system comprises an application layer, a budget layer and a control layer, the application layer comprises a system management module, the system management module comprises a user management unit, an authority management unit, a system setting unit, an interface management unit, a reminding management unit and a personalization setting unit. The budget layer comprises a price library of goods and supplies, a production standard cost unit, an infrastructure standard cost unit, a budget preparatioin unit and a country company budget unit. The price library of the goods and materials receives data of the system management module and transmits the data to the production standard cost unit and the infrastructure standard cost unit, and the production standard cost unit and the infrastructure standard cost unit transmit the data to the budget preparation unit and the country company budget unit. Finance business information which is rapid, accurate and comprehensive can be provided, a perfect and effective analyzing means can be provided, and the full chain budget data processing system can form a networked financial management information system in combination with an existing ERP system in a high integration mode.

Description

technical field [0001] The invention relates to a system and method for processing full-chain budget data of a standard cost system for infrastructure construction. Background technique [0002] At present, the mature packaged software and financial management and control system have basically met the State Grid Corporation's needs for basic financial processing such as budget preparation and process control. However, in light of the company's actual situation, there are still some links that need to be further strengthened in terms of budget refinement processing: Emphasis on programmatic budget processing, but insufficient application of the latest results of budget processing; there are many internal packaging procedures, the response is not timely enough, and it is difficult to quickly realize the processing needs of users; project information is too scattered, it is difficult to fully reflect the project implementation process and implementation dynamics Wait. [0003]...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
Inventor 王端瑞毛育冬纪鹏志潘树怡姜传雷马林程畅佟瑞刚王云霞吕鹏
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products