Urban public transport operation scheme optimization method
An optimization method, the technology of urban public transportation, applied in traffic control system, traffic control system of road vehicles, instruments, etc., can solve the problem of little help in the optimization and construction of public transportation, so as to improve the efficiency of public transportation operation, reduce the operation cost of public transportation, Conceive Unique Effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] Embodiment 1: a kind of urban public transport operation scheme optimization method, comprises the following steps:
[0031] (1) Steps of data collection:
[0032] Collect the following data for several days:
[0033] Static data, including all bus lines, stations, shifts of each bus line, and departure time of each shift;
[0034] Dynamic data, including the vehicle type of each shift, the arrival time of each shift at each station, the number of boarding and disembarking passengers of each shift at each station;
[0035] (2) Steps to create a database
[0036] Divide the data collected in step (1) into holiday data and working day data, and establish a holiday data sub-database and a working day data sub-database. library composition;
[0037] (3) Steps to analyze data
[0038] Analyze separately in each sub-library: A. The full load rate of each station at each time period; B. The waiting time of each station at each time period; C. The average full load rate of...
Embodiment 2
[0043] Embodiment 2: The difference from Embodiment 1 is that it also includes the step of allowing the dispatching center to access the historical database, read and store the storage arrays in a recent period of time, thereby analyzing the full load rate in all storage arrays:
[0044] If in a certain period of time, the current bus line is under the small car, and the average full load rate reaches 130%, an instruction to replace the small car with a medium-sized car will be issued;
[0045] If in a certain period of time, the current bus line is under the small car, and the average full load rate reaches 150%, an instruction to replace the small car with a large car will be issued;
[0046] If in a certain period of time, the current bus line is under medium-sized vehicles, and the average full load rate reaches 140%, an instruction to replace medium-sized vehicles with large vehicles will be issued;
[0047] If a certain bus line, under a certain period of time, the full ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com