Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Project management system

A technology of engineering management and presentation layer, applied in data processing applications, instruments, resources, etc., can solve the problems of old-fashioned fixed mode, low scalability, low efficiency, etc., to avoid unnecessary costs, avoid redundant data, The effect of data storage simplification

Inactive Publication Date: 2014-07-30
贵州永恒光科技有限公司
View PDF2 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The management of construction projects is a complex system operation. In the process of management, it often needs to process a large amount of data quickly. On the whole, the government's management of construction projects involves a wide range of areas, and the needs of various departments are also different. Therefore, if each If a government department independently designs a system, the cost is too high, and various problems are prone to occur in the connection, resulting in low efficiency and affecting the final effect of the construction project
[0003] In the prior art, there is a technique of using computer technology to manage construction projects, such as the Chinese invention patent "A Project Management Monitoring System and Method (Publication Number: CN101551882A, Publication Date: October 7, 2009)" discloses a A system based on handheld terminal application servers to manage and monitor projects. Obviously, the system adopts an old-fashioned fixed model, and the scalability is not high. If it is actually used, each government department that needs to manage projects needs to design each part separately, and It also needs to be extended according to its own needs, which does not solve the above-mentioned problem of difficulty in connecting the various departments
[0004] Another example is the Chinese invention patent "Control and Management System for Engineering Construction Project Contracting (Publication Number: CN102955982A, Publication Date: March 6, 2013)" which discloses an enterprise-level distributed architecture system based on the .NET standard. The system makes full use of the advantages of .NET, realizes business distribution and control integration, and adopts an object-oriented architecture, so that each part can be independently designed, implemented and tested, thus providing good reliability for project supervision. Extended system, but there are still serious defects in the actual application of the system: the access to the database is direct access to each part, which leads to the possibility that similar or even the same data between different departments will exist repeatedly, and in order to avoid The occurrence of this kind of situation will inevitably lead to the programmers of various departments must be coordinated with the programmers of other departments, especially for the data access structure must be coordinated, and the actual realization of this will inevitably require all departments to jointly discuss a unified Obviously, under the current national conditions in our country, it is almost impossible to achieve this, so the system can only be applied to a single government department in the end. As a result, the system seems to have made a breakthrough in technology, but in fact it still has no make any substantial progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The technical solution of the present invention is further described below, but the scope of protection is not limited to the description.

[0019] Such as figure 1 The shown engineering management system includes presentation layer 100, business layer 200, service layer 300, and data layer 400; information is sequentially transmitted and fed back along the presentation layer 100, business layer 200, service layer 300, and data layer 400; The presentation layer 100, business layer 200, service layer 300, and data layer 400 are all developed using .NET technology; the interface of each module in the presentation layer 100, business layer 200, service layer 300, and data layer 400 adopts a unified standard ,protocol.

[0020] The presentation layer 100 includes a touch screen 101 , a client 102 , and a webpage 103 .

[0021] The business layer 200 includes engineering survey examination 201 , construction engineering examination 202 , municipal engineering examination 2...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a project management system which comprises a presentation layer, a business layer, a service layer and a data layer. Information is sequentially transmitted and is fed back through the presentation layer, the business layer, the service layer and the data layer. The presentation layer, the business layer, the service layer and the data layer are developed by the adoption of the .NET technology. The uniform standard protocol is adopted in interfaces of modules in the presentation layer, the business layer, the service layer and the data layer. According to the project management system, due to the SSH basic structure, cohesion conflicts which possibly happen are effectively avoided; the service layer and the data layer have higher stability; when the specific modules are developed, a development team can conduct independent research and development according to independent functional requirements.

Description

technical field [0001] The invention relates to an engineering management system. Background technique [0002] The management of construction projects is a complex system operation. In the process of management, it often needs to process a large amount of data quickly. On the whole, the government's management of construction projects involves a wide range of areas, and the needs of various departments are also different. Therefore, if each If a government department independently designs a system, the cost is too high, and various problems are prone to occur in the connection, resulting in low efficiency and affecting the final effect of the construction project. [0003] In the prior art, there is a technique of using computer technology to manage construction projects, such as the Chinese invention patent "A Project Management Monitoring System and Method (Publication Number: CN101551882A, Publication Date: October 7, 2009)" discloses a A system based on handheld termin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 王振一潘万康
Owner 贵州永恒光科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products