Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

On-site real-name system attendance method

A real-name system, construction site technology, applied in instruments, registration/instruction, time register, etc., can solve the problem of not being able to deal with personnel transfer well, and achieve the effect of strong practicability, chaotic change management, and not easy to make mistakes.

Active Publication Date: 2016-08-24
杭州和信建筑劳务有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The present invention aims at the shortcomings of the existing technology that cannot well deal with personnel attendance at work sites such as construction sites where personnel are frequently transferred, and provides a technology for pre-entry of time card information, which can separate the process of card making and card issuance, and is used for real-name system at construction sites Attendance can effectively improve the attendance success rate of personnel in construction sites and other workplaces

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • On-site real-name system attendance method
  • On-site real-name system attendance method
  • On-site real-name system attendance method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] A time card information pre-entry technology, comprising the following specific steps:

[0028] Preparatory steps: The attendance card adopts the ID card in RFID technology, and each ID card has a unique internal code in the world. The inner code is too long and inconvenient to manage. We will number the time card (employment number) in order.

[0029] Card data production: the corresponding relationship between the ID card internal code and the job number is pre-made into a file, and input into the data storage device 1;

[0030] Card issuance and attendance personnel registration: The normal card issuance system registers the internal code of the card when personnel enter the venue, and directly associates the internal code of the card with personnel information for judging attendance information. Taking into account the characteristics of the construction site, our system can start attendance work without any computer operation. The method is to keep the worker's i...

Embodiment 2

[0036] A real-name attendance checking method at a construction site, which is different from Example 1. In order to further realize modular work steps and facilitate the design of work modules of the attendance system, the steps recorded in Example 1 are re-divided. In particular, as Figure 1-4 shown, including the following specific steps:

[0037] Preparatory step 100: assign a unique identification number for the attendance card, swipe the card for the first time according to the sequence of the job number programmed in advance, and import the unique identification number sequence arranged according to the order of swiping the card into the data storage device I; this step is the same as that of the system Corresponding to the card process, it is usually completed in the card making stage.

[0038]Association step 200: Record the information of the personnel to be checked on. The information of the personnel to be checked on attendance needs to be recorded before swiping ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to the field of attendance application methods, and discloses a construction site real-name system attendance method, comprising: recording a unique identification number in an attendance card, and inputting the unique identification numbers into a data storage device 1 respectively; The unique identification number recorded in the attendance card is judged; If there is the unique identification number in the data storage device 1, then judge whether the personnel information to be checked has a one-to-one correspondence with the unique identification number and has existing data storage In the device II; if the information of the person to be checked has a one-to-one correspondence with the unique identification number can be found in the data storage device II, then generate an attendance record. The advantage of the present invention is that it completely separates the card making and card issuing processes, simplifies the card swiping operation process, improves the real-time performance of the system, and can especially solve the problem that the actual effect of the card swiping attendance system caused by frequent personnel exchanges on the construction site is not good. good question.

Description

technical field [0001] The invention relates to the field of attendance application methods, in particular to a method for pre-entrying attendance cards, which can separate the process of data entry and issuance of time attendance cards, and is especially suitable for real-name attendance at construction sites where workers are highly mobile and management forces are relatively weak. Background technique [0002] In order to prevent workers' wage risks, many construction sites have adopted the real-name attendance system for construction workers. Ordinary attendance system, attendance cards are made on site after workers register. Because the workers on the construction site are highly mobile, the workload of the project department personnel is also heavy, and because many project department personnel on the construction site are too old and not good at computer operations, it is difficult to make cards immediately after the workers report. In many cases, it has affected th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G07C1/10
Inventor 柳刚强
Owner 杭州和信建筑劳务有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products