Construction method of super-long steel sheet pile cofferdam in deep water under tidal environment
A technology of steel sheet pile cofferdam and construction method, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., to achieve the effect of improving reusability, good social and economic benefits, and short construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0035] This embodiment is the construction method used in the SG14 bid section L bridge of the first phase project of the railway S1 line in a certain city. The L bridge is a construction method used in a large-scale four-line double-width railway bridge project. Across the O river section 2450m. The trestle bridge of the L Bridge connects the north and south banks of the O River. It is the link between the construction platform of the main pier of the bridge and the land. It is also the only channel for construction and transportation on the north and south banks. It is the lifeline of water construction. There are several caps for the bridge foundation located in the middle of the river, all of which are deep-water foundations with a water depth of up to 15m. All of them are constructed with steel sheet pile cofferdams. The maximum length of steel sheet piles is 33m, which is currently the longest steel sheet pile in China.
[0036] The construction method of a deep-water ul...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com