Construction method for deep foundation pit penetrating underground permeable layer

A construction method and technology for permeable layers, which are applied in basic structure engineering, excavation, construction, etc., can solve problems such as difficulty in ensuring precipitation effects, difficulty in determining precipitation plans, and difficulty in formulating treatment plans, and achieve good water interception effect and structure. Simple, easy-to-use effects

Inactive Publication Date: 2015-12-09
CHINA 19TH METALLURGICAL CORP
View PDF4 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the pre-precipitation scheme is adopted, it is difficult to determine the specific precipitation scheme, and its precipitation effect is difficult to guarantee; if the large-scale excavation scheme is adopted, the pumping and drainage of the groundwater in the aquitard must be solved no matter whether it is single-stage or staged excavation. The water stop of the surface water above the aquifer and the interception of the groundwater below the aquifer, etc. This technical problem often confuses engineering and construction personnel, and it is often difficult to formulate a practical solution

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for deep foundation pit penetrating underground permeable layer
  • Construction method for deep foundation pit penetrating underground permeable layer
  • Construction method for deep foundation pit penetrating underground permeable layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0025] The construction method of the deep foundation pit passing through the underground water-permeable layer comprises the following steps:

[0026] A, excavation of the soil above the permeable layer 10 forms the upper pit 9;

[0027] B, excavate the water collection well 1 at the bottom of the upper pit 9, and fill the bottom of the water collection well 1 with pebbles or coarse sand;

[0028] C, install and fix the suction water pump 11, the suction pipe 12 of the suction water pump 11 is put into the sump 1;

[0029] D, excavate drainage open ditch 6 on three sides at the bottom of the upper pit 9, the drainage open ditch 6 extends to the water collection well 1, and the suction water pump 11 is turned on for pumping;

[0030] E. The side slope hanging net sprayed concrete retaining wall 2 of the upper pit 9;

[0031] F, excavate the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a deep foundation pit penetrating an underground permeable layer, relates to the technical field of foundation pit excavation, and provides the construction method for the deep foundation pit penetrating the underground permeable layer, and accordingly, the foundation fit earth excavation process, the building foundation construction process and the foundation pit earth backfilling process can be prevented from being affected by underground water. The method comprises the steps that a soil body above the permeable layer is excavated; a water collecting well is excavated; water in the water collecting well is pumped through a suction water pump; concrete is sprayed to a slope hanging net of an upper pit to protect the wall; an open drain and a spray drain are excavated; a soil outlet lane is excavated; the foundation pit is excavated; solid construction is carried out in the foundation pit; and soil backfilling is carried out. The construction method is suitable for construction of various deep foundation pits penetrating the underground permeable layer. The structure is simple, operation is convenient, and environment friendliness and energy saving are achieved. The effect of stopping of surface water above the permeable layer and the water stop effect on the underground water below the permeable layer are good.

Description

technical field [0001] The invention relates to the technical field of foundation pit excavation, in particular to a construction method for a deep foundation pit passing through an underground water permeable layer. Background technique [0002] For deep foundation pits that pass through the underground aquitard, there is only surface water above the aquitard, and there is no groundwater below the aquitard. How to deal with the groundwater in the middle permeable layer of the foundation pit is a key technical issue in the construction of the deep foundation pit body and the earthwork backfilling of the foundation pit. If the pre-precipitation scheme is adopted, it is difficult to determine the specific precipitation scheme, and its precipitation effect is difficult to guarantee; if the large-scale excavation scheme is adopted, the pumping and drainage of the groundwater in the aquitard must be solved no matter whether it is single-stage or staged excavation. The water stop...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D19/10E02D19/08
Inventor 黄成友代权宋雪梅张鉴
Owner CHINA 19TH METALLURGICAL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products