Building waterproof layer
A technology of building waterproofing and glue layer, applied in building components, building insulation materials, layered products, etc., can solve the problems of easy water seepage, high requirements for production equipment, complex production process, etc., and achieve high vertical and horizontal tensile force and tear strength , Good leak-proof and moisture-proof performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0014] Example 1; such as figure 1 As shown, this kind of building waterproof layer mainly includes a PVC layer 1 and a woven cloth layer 2, and a glue layer 3 for compounding is provided between the PVC layer 1 and the woven cloth layer 2. The PVC layer 1 is made of soft foamed PVC, and the glue layer 3 is made of polyurethane glue.
[0015] The specific production process: through the dry-wet laminating machine, the PVC layer 1, the glue layer 3 and the woven cloth layer 2 are compounded together. After the compounding is completed, it is placed in an oven at a temperature of 40-60 degrees for about 48 hours, and the glue is completely After volatilization, it is measured into rolls through trimming, storage, measurement and winding processes.
Embodiment 2
[0016] Example 2: Such as figure 2 As shown, the difference from Embodiment 1 is that the woven fabric layer 2 is coated before being compounded. There is a first film layer 4 on the composite surface of the woven fabric layer 2 to form a coated woven fabric layer. The film layer 4 adopts a PE film or a PP film.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 