A concrete-filled steel tube and concrete technology, which is applied in construction, sheet pile wall, infrastructure engineering and other directions, can solve the problems of construction difficulty, inconsistent load conditions, waste of concrete materials, etc., to optimize the pouring process, the operation process is simple and convenient, and the reduction of The effect of construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be described in further detail below through specific implementation examples in conjunction with the accompanying drawings.
[0027] Such as Figure 1-4 As shown, the present application provides a method for synchronous and continuous pouring of steel pipe concrete column piles with variable grades under water, which is realized by a pouring device. The pouring device includes a steel pipe column 1 and a pile hole 2, and the steel pipe column 1 is located in the pile hole 2.
[0028] The pouring method is implemented in the following steps:
[0029] Step S00: if figure 1 As shown, inject the first type of marked concrete 51 into the pile hole 2 through the conduit 3 until the level of the pouring surface of the first type of marked concrete 51 is consistent with the level of the design interface 10 . The first graded concrete 51 is a low graded concrete, which is located at the bottom of the pile hole 2 . The design interface 10 is the pr...