Bored tunnel mechanized construction method in combination with drilling injection method

A construction method and technology of underground excavation, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of complicated procedures, narrow construction space, and low degree of mechanization of underground excavation construction, and achieve the goal of saving human resources and improving efficiency Effect

Active Publication Date: 2016-07-13
BEIJING MUNICIPAL CONSTR +1
View PDF12 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, with the increase of underground engineering projects in major cities, especially in the current domestic infrastructure construction environment, Beijing, Shanghai, Tianjin, Nanjing, Guangzhou, Shenzhen, Xi'an and other cities have planned a large number of underground tunnel engineering projects. The shallow burial and underground excavation method has ushered in a second opportunity for its development. However, due to the narrow construction space and complicated procedures, ordinary construction machinery cannot meet the construction requirements. Therefore, the degree of mechanization of the underground excavation method is very low, and it mainly relies on manual operations.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bored tunnel mechanized construction method in combination with drilling injection method
  • Bored tunnel mechanized construction method in combination with drilling injection method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0034] In the construction process of the underground excavation tunnel section combined with the drilling and injection method, such as figure 1 , figure 2 As shown, a mechanized construction method of underground excavation tunnel combined with drilling and injection method includes the following steps:

[0035] Step 1), the diameter and length of the leading small conduit 2 driven into the face 1 and the amount of grouting during grouting must be controlled within a reasonable range;

[0036] When the face 1 of the tunnel is excavated by the shallow buried excavation method, due to the extrusion deformation of the advanced core soil of the face 1, a large surface settlement will be generated in front of the face 1 of the tunnel excavation. Therefore, in Before excavating the tunnel face 1, it is necessary to drive a certain length and dia...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bored tunnel mechanized construction method in combination with a drilling injection method, and belongs to the technical field of tunnel engineering.Advanced reinforcement is carried out on a tunnel face with the drilling injection method, and then mechanized construction of a subway tunnel is carried out in combination with subway soft soil excavation equipment.The specific construction method includes the following steps that firstly, a left drilling part and a right drilling part are constructed at the same time, and advanced small pipes are driven into the tunnel face; 2, mechanized soil excavation is achieved through an excavation main arm, and real-time collection is carried out through a spading plate; 3, grids are erected and lifted through the excavation main arm, the top grid is fixed, and then the grids on the two sides are positioned and connected; fourthly, the operation of grid connecting bolt fastening, connecting steel bar welding, mesh sheet combining, guniting, construction, correction and the like is carried out through a manual operation platform carried on the subway soft soil excavation equipment.By means of the construction method, the construction efficiency of the bored tunnel section in subway construction can be improved, labor input can be reduced, and the construction period can be shortened.

Description

technical field [0001] The invention relates to a mechanized construction method for a buried tunnel combined with a drilling and injection method, and belongs to the technical field of tunnel engineering. Background technique [0002] At present, with the increase of underground engineering projects in major cities, especially in the current domestic infrastructure construction environment, Beijing, Shanghai, Tianjin, Nanjing, Guangzhou, Shenzhen, Xi'an and other cities have planned a large number of underground tunnel engineering projects, The shallow burial and underground excavation method ushered in a second opportunity for its development. However, due to the narrow construction space and complicated procedures, ordinary construction machinery cannot meet the construction requirements. Therefore, the degree of mechanization of the underground excavation method is very low, mainly relying on manual operations. [0003] With the increase of labor costs in recent years, t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/10E21D9/12E21D11/15
CPCE21D9/001E21D9/10E21D9/122E21D9/126E21D11/152
Inventor 王文正孔恒黄明利杨建华李琳刘学义石国伶韩雪刚张艳秋马虹霞郑雪梅潘政
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products