Cluster resource control method used for complicated production management system
A production management system and resource control technology, applied in the field of computer distributed software systems, can solve problems such as unbalanced processing node load and recovery of faulty nodes, and achieve the effects of improving overall throughput, improving utilization, and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0043] A cluster resource control method used in a complex production management system of the present invention comprises the following steps:
[0044] A dynamically expandable cluster structure is constructed for the complex production process management system in the manufacturing industry. The dynamically expandable cluster structure includes several service nodes and a cluster resource coordinator. Service nodes or cluster resource coordinators are ordinary computers. Each service node undertakes only one task, and the cluster resource coordinator can deploy tasks of multiple service nodes at the same time.
[0045] According to the particularity of the production process in the manufacturing industry, the tasks undertaken by each service node are classified according to the task category information of business processing, data collecti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com