Embedding and fixing method for protective tubes of deep water slope basement under variable water levels

A fixing method and variable water level technology, which is applied in the direction of foundation structure engineering, construction, and sheet pile walls, etc., can solve the problems such as difficulty in burying base casings in deep water slopes with variable water levels, difficulty in pile foundation construction, and frequent water level fluctuations, etc. The effect of operation, high efficiency and advanced construction technology

Active Publication Date: 2016-11-23
HUANGHE ENG BUREAU HENAN
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In water conservancy projects, it is very difficult to bury the base casing of slopes with variable water level and deep water, and there are many technical problems. For example, in the construction of pile foundations for the small Three Gorges Bridge in the Danjiangkou Reservoir of the South-to-North Water Diversion Project, the pier No. 1 is located on the bottom of the slope reservoir, and the water depth is up to 25 meters and the water level fluctuates frequently. These unchangeable natural conditions have caused great difficulties to the construction of the pile foundation, especially the burying and fixing of the casing in the early stage, there are many technical difficulties

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Embedding and fixing method for protective tubes of deep water slope basement under variable water levels
  • Embedding and fixing method for protective tubes of deep water slope basement under variable water levels
  • Embedding and fixing method for protective tubes of deep water slope basement under variable water levels

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0030] A method for embedding and fixing base casings of deep-water slopes with variable water levels, process principle: see figure 1 , using pebble throwing and filling technology, throwing pebbles around the casing to form a cofferdam, adding large sand and laterite mixture to the silt and rocks in the cofferdam, adding laterite into the casing, and supporting the slope base of the casing It becomes a stable plane suitable for the placement of the casing, and the bottom of the casing has a certain burial depth of sand, stone, and laterite mixture, and underwater concrete is poured in the specified area around the casing to realize the fixing of the bottom of the casing.

[0031] see figure 2 and image 3 , using the self-developed free telescopic casing 2, so that the casing can be stepped up and down to adapt to the change of water level. The problem ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an embedding and fixing method for protective tubes of a deep water slope basement under variable water levels. The embedding and fixing method comprises the following steps that the telescopic protective tubes are manufactured; pay-off is conducted, and the position of a bridge pier is located; a construction platform is manufactured on floating boats and is dragged to the position of the bridge pier and fixed; pay-off is conducted on the construction platform, and the pile positions are determined; the inner protective tubes are placed through a crane and fixed to the construction platform; pebbles are thrown on the periphery of the construction platform; red soil is added in the protective tubes; a mixture of big sand and the red soil is added within the range of the construction platform; sand gravel is thrown on the upper portion of the big sand layer within the range of the construction platform; and underground concrete is poured on the upper portion of the sand gravel, and the outer protective tubes are mounted. According to the embedding and fixing method, the pebbles, the big sand and the red soil are placed in a throwing and filling manner, then the underground concrete is poured, and installing and fixing of the bottoms of the protective tubes on the slope basement are achieved; the self-developed protective tubes capable of extending and contracting freely are adopted so that the protective tubes can ascend and descend in a stepless manner to adapt to the water level changes; the protective tubes capable of extending and contracting freely and the construction platform are connected through universal wheels, and it is guaranteed that the positions of the protective tubes are fixed; and operation is facilitated, and the effect is good.

Description

technical field [0001] The invention relates to the technical field of foundation casing embedding of water conservancy projects, in particular to a method for embedding and fixing a casing of a foundation casing on a slope with variable water level and deep water. Background technique [0002] In water conservancy projects, it is very difficult to bury the base casing of slopes with variable water level and deep water, and there are many technical problems. For example, in the construction of pile foundations for the small Three Gorges Bridge in the Danjiangkou Reservoir of the South-to-North Water Diversion Project, the pier No. 1 is located on the bottom of the slope reservoir, and the water depth is up to 25 meters and the water level fluctuates frequently. These unchangeable natural conditions have caused great difficulties to the construction of the pile foundation, especially in the early stage of burying and fixing the casing, there are many technical difficulties. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/66E02D7/00
Inventor 吕连盛刘同凯杨小东曹为民尚永立肖发光王效宇王建德高冠鹏杨生萍朱学民周灵杰谢有成谢海燕
Owner HUANGHE ENG BUREAU HENAN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products