A kind of grouting material and technology for construction, which is applied in the direction of building components, building reinforcements, building structures, etc. It can solve the problems that the grouting effect or quality cannot be effectively detected, the assembly rate of prefabricated buildings is affected, and the sleeve and the steel bar are not easy to connect. , to achieve the effect of overcoming the large dispersion of grouting quality, reducing the material of grouting pipe and grouting pipe, and stabilizing the quality of grout with precise ingredients

Active Publication Date: 2017-01-25
杨晓彤
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In addition to the traditional grouting sleeve, there are many installation procedures, the grouting is not easy to control, the sleeve and the steel bar are not easy to connect, the insertion is difficult, and the installation efficiency is extremely low.
Although the principle of the traditional grouting sleeve is feasible, the grouting quality cannot be guaranteed because the grouting quality is easily affected by the level, quality, sense of responsibility of the grouting workers, the quality of the grouting material, and external conditions such as weather. The most terrible thing is the grouting effect Or the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Preset slurry grouting sleeve for building, prefabricated member connecting structure and prefabricated member connecting method
  • Preset slurry grouting sleeve for building, prefabricated member connecting structure and prefabricated member connecting method
  • Preset slurry grouting sleeve for building, prefabricated member connecting structure and prefabricated member connecting method

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0038] Example 1

[0039] A kind of preset grouting sleeve for construction, such as figure 1 As shown, a sleeve body 3 is included. The upper part of the sleeve body 3 is provided with a threaded connection hole 2 for threaded connection with the upper reinforcing steel bar 1, and the sleeve body 3 has a slurry cavity in the slurry cavity. A slurry capsule 4, the slurry capsule 4 is encapsulated in the slurry cavity by a sealing tin foil 5. In order to ensure that the sealing tin foil 5 is damaged during transportation, a protective rubber plug 6 is installed at the bottom of the sleeve body 3. The rubber plug is preferably Perforated rubber plug.

[0040] The slurry capsule 4 includes at least two slurry capsules, the slurry in each capsule does not coagulate, but the slurry after the at least two slurry capsules are squeezed and broken by the lower steel bar is mixed together to form a coagulable After the slurry is mixed and solidified, the upper and lower steel bars are fixed...

Example Embodiment

[0045] Example 2

[0046] A kind of preset grouting sleeve for construction, such as image 3 As shown, a sleeve body 3 is included. The lower part of the sleeve body 3 is provided with a threaded connection hole 2 for threaded connection with the lower steel bar 7, and the sleeve body 3 has a slurry cavity in the slurry cavity. A slurry pouch 4, the slurry pouch 4 is sealed in the slurry cavity by sealing tin foil 5.

[0047] The slurry capsule 4 includes at least two slurry capsules, the slurry in each capsule does not coagulate, but the slurry after the at least two slurry capsules are squeezed and broken by the upper steel bar is mixed together to form a coagulable After the slurry is mixed and solidified, the upper and lower steel bars are fixedly connected together.

[0048] The slurry bladder 4 is preferably a two-material slurry bladder.

[0049] A connection structure for prefabricated parts, such as Figure 4 As shown, it includes an upper prefabricated member 8 with upper...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a preset slurry grouting sleeve for a building, a prefabricated member connecting structure and a prefabricated member connecting method. The preset slurry grouting sleeve for the building comprises a sleeve body, wherein a screw thread connection hole is formed in one end of the sleeve body, the sleeve body is connected with a first reinforcing steel bar in a threaded manner through the screw thread connection hole, a slurry chamber is arranged at the other end of the sleeve body, and extends towards the inside of the sleeve body, a plurality of slurry bags are arranged in the slurry chamber in a sealed manner through sealing sheets, and slurries in the respective slurry bags are mixed with one other uniformly and coagulate to fixedly connect the sleeve body with a second reinforcing steel bar when the plurality of slurry bags are squeezed to crack by a second reinforcing steel bar. The preset slurry grouting sleeve for the building disclosed by the invention has the advantages of increased construction efficiency, reduced cost and capability of producing enormous economic benefits.

Description

technical field [0001] The invention relates to a pre-installed grouting material sleeve for construction, a prefabricated part connection structure and a connection method, and is especially suitable for the field of prefabricated buildings. Background technique [0002] At present, the upper steel bar and the lower steel bar of the building industrialization prefabricated components are connected by sleeves, and the sleeves are installed in the prefabricated components, and have been connected with the sleeve screws when the upper steel bars are prefabricated. The lower reinforcement is inserted into the sleeve, and then grouted through the reserved holes to connect the upper reinforcement and the lower reinforcement through the sleeve. [0003] In addition to the traditional grouting sleeve, there are many installation procedures, the grouting is not easy to control, the sleeve and the steel bar are not easy to connect, the insertion is difficult, and the installation eff...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04C5/16
CPCE04C5/165
Inventor 杨晓彤彭凯玲杨万和彭昱蔡灿
Owner 杨晓彤
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products