Construction method capable of replacing steel support substitution by full space supports
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CCTEB INFRASTRUCTURE CONSTR CO LTD
- Publication Date
- 2017-04-19
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to an optimal design for replacing steel bracing with full-wall brackets in the construction process of a main structure during the construction of a subway station, in particular to a construction method for replacing steel braces with full-wall brackets. Background technique
[0002] In the construction process of the main structure of the open-cut Shunzuo subway station, it is necessary to use steel support and full-wall support, such as figure 1 structure is shown. The existing construction method is: after the construction of the station floor 1 is completed, when the side wall 2 is constructed, the first part of the full hall support 3 needs to be erected. The enclosure structure system composed of the enclosure structure 6, the second steel support 7, and the first concrete support 8 is stable. The third steel support 9 is removed, and the second part of the full hall support 3 is continued to be erected, and the side wall...