Construction method for high-rise housing novel building system under general-control construction period
A technology of high-rise residential buildings and construction methods, which is applied in the direction of building construction, building material processing, construction, etc., and can solve problems such as large deviations, unformed, and unreasonable construction period data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0106] The embodiments of the present invention will be described in detail below.
[0107] The construction method under the master control period of the new high-rise residential construction system includes the following steps:
[0108] Foundation construction, the duration of foundation construction T a Control to be completed within 60 days to 210 days;
[0109] The construction period T from the foundation cushion to the positive and negative zero construction and the foundation cushion to the positive and negative zero construction b Control to be completed in 40 to 76 days;
[0110] N-layer main structure layer construction, N-layer main structure layer construction period T ci Control in 5 to 12 days to complete;
[0111] N-1 layer demoulding layer construction, N-1 layer demoulding construction layer construction period T 1 Control to complete within 5 to 6 days;
[0112] The construction period of N-2 layer supporting roof water-stop layer, N-2 layer supporting roof water-stop...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap