Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

233results about How to "Forward-looking" patented technology

Coal and gas outburst hazard early warning system and early warning method

ActiveCN101550841APrevention of Outstanding DisastersReal-timeMining devicesDust removalForward lookingGeological structure
The invention relates to the field of coal mine safety technique, specifically to a down-hole coal and gas outburst hazard early warning system and early warning method. The coal and gas outburst synthesized early-warning system, uses the existing local area network to connect a synthesized early-warning data server, an early-warning data management system and the existing coal mine safety monitoring system; analyzes the coal and gas outburst early-warning data in the synthesized early-warning data server by an outburst early-warning module; and emits early-warning information based on the analyzed result. The inventive coal and gas outburst synthesized early warning system and early warning method can perform centralized management and comprehensive analysis of the geological structure, coal seam occurrence, gas occurrence, mining production, daily forecast indicators, outburst forecast, gas emission and other security information that originally scatter in various functional sections of coal mine on the geographical information system GIS platform, integrates the existing resources, improves the accuracy of early warning, so that the early warning is both real-time and forward-looking, and can effectively prevent the occurrence of coal and gas outburst in coal mine.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Method and system for establishing smart city 'multi-specification-in-one' evaluation system

InactiveCN109636150AImprove and optimize the work of "integrating multiple plans into one"Forward-lookingResourcesThree levelEngineering
The invention discloses a method and a system for establishing a smart city 'multi-specification-in-one 'evaluation system. The establishment method comprises the following steps: constructing a framework of a smart city multi-standard-in-one effect evaluation index system, and forming a first-level index and a second-level index; establishing a three-level index of a smart city 'multi-standard-in-one' evaluation index system; quantifying the third-level index through an index quantification method; determining the weights of the first-level index, the second-level index and the third-level index; and calculating the score value of the smart city'multi-specification-in-one', and defining the evaluation level of the 'multi-specification-in-one' effect of the smart city. The implementation system comprises an evaluation index management module, an evaluation input module, an evaluation output module and a user management module. According to the method, the blank of the evaluation methodfor the implementation effect of multi-specification integration of the smart city is filled, the research category and the research method in the field are expanded, and the method has foresight, scientificity and operability.
Owner:南京市城市规划编制研究中心

Real-time dynamic obstacle avoidance device and obstacle avoidance method of dual robots

InactiveCN105479490ARealize real-time dynamic obstacle avoidanceWith dynamic obstacle avoidance functionProgramme-controlled manipulatorCollision detectionEngineering
The invention discloses a real-time dynamic obstacle avoidance device and obstacle avoidance method of dual robots. The obstacle avoidance device comprises an obstacle avoidance master control module. The obstacle avoidance master control module comprises a position detection module, a collision detection module and a dynamic obstacle avoidance module which are sequentially connected. The position detection module is in communication with motors of dual robot bodies and is used for collecting position information of the dual robot bodies in real time. The collision detection module is used for receiving the position information sent by the position detection module and comparing the position information with the collision safety distance of the dual robot bodies. The dynamic obstacle avoidance module is used for receiving a comparison value of the collision detection module to plan an obstacle avoidance path of the dual robot bodies and send the obstacle avoidance path to motor executers of the dual robot bodies to execute a new obstacle avoidance path. According to the real-time dynamic obstacle avoidance device and obstacle avoidance method of the dual robots, the robot waiting time in the obstacle avoidance process can be shortened, real-time dynamic obstacle avoidance can be achieved, and therefore the work efficiency of the dual robots is improved.
Owner:HUAZHONG UNIV OF SCI & TECH

Smart city fire protection IOT big data management system

The present invention provides a smart city fire protection IOT (Internet of Thighs) big data management system, and relates to the technical field of fire protection. The system comprises a data collection mechanism for collecting historical data and real-time data, a data processing mechanism for performing machine learning on the historical data and establishing a predictive model, a data analysis mechanism for analyzing the real-time data by using the predictive model and making a fire occurrence probability, and a data transmission mechanism for transmitting the fire occurrence probability to customers. The historical data comprises hardware information and fire records. The hardware information comprises the historical usage time of the firefighting hardware corresponding to different moments in the past, historical maintenance of the firefighting hardware, and historical fire alarm information collected by using the firefighting hardware. The fire records comprise the time, theplace and the cause of fire occurrence. The real-time data comprises the real-time usage time of the firefighting hardware, real-time maintenance of the firefighting hardware, and real-time fire alarminformation collected by using the firefighting hardware. According to the system provided by the present invention, the integrated management of the fire protection industry can be implemented, andthe work efficiency and management of fire protection can be improved.
Owner:成都恒华光讯科技有限公司

Continuous preparation device and method for fuel cell membrane electrode

The invention discloses a continuous preparation device and method for a fuel cell MEA membrane electrode. The device comprises a continuous preparation device for a roll fuel cell CCM membrane electrode and a continuous preparation device for a sheet fuel cell MEA membrane electrode. According to the device and method, which are provided by the invention, electrode layers are coated on both sidesof a proton exchange membrane; a self-adhesive carrier membrane capable of repeated simultaneous attachment and peeling is used as a carrier and a production information recorder to prepare a continuous CCM membrane electrode coil, wherein the surface of the self-adhesive carrier membrane is processed; the self-adhesive carrier membrane is further used as the carrier; relying on a precise conveying system, the processes of gas diffusion layer bonding and gas sealing layer bonding are carried out to prepare an MEA membrane electrode monomer; and synchronous cutting is carried out to acquire the MEA membrane electrode monomer meeting industrial standards. The high-efficiency, intelligent, integrated and fully-closed device disclosed by the invention can greatly improve the production capacity and greatly reduce the cost of the membrane electrode monomer.
Owner:上海好世材料科技有限公司

High-precision map and sensor fusion based location method of ramp of underground parking garage

InactiveCN107270915ASolve the problem of ramp positioning for automatic drivingForward-lookingInstruments for road network navigationIn vehicleRadar
The invention discloses a high-precision map and sensor fusion based location method of a ramp of an underground parking garage. The location method comprises the following steps of a step 1), when an autonomous vehicle is enabled to begins entering the ramp of the underground parking garage, apperceiving the type of the ramp by an in-vehicle gradient sensor, so as to obtain the information that the vehicle is enabled to begins entering the ramp of the underground parking garage; a step 2), when the autonomous vehicle is enabled to begins entering the ramp, measuring distances of the vehicle to two walls by radar sensors on two sides of the vehicle, judging the starting point, at the ramp, of the vehicle in a matching manner by the distances and the high-precision map in a matching manner, and establishing a three-dimensional coordinate system in the matching manner according to the relative position, , at the ramp, of the starting point and the high-precision map in the matching manner; a step 3), subjecting a known path to digital curving to obtain the formula of the known path, and correspondingly moving transferring into the three-dimensional coordinate system; a step 4), after the autonomous vehicle is enabled to enters the ramp, calculating the running mileage of the vehicle through a wheel speed pulse signal output value, matching the mileage with the formula of the path subjected to the curving to obtain the point coordinates of a corresponding curve length, namely the location coordinates of the vehicle in the coordinate system at the moment, of a corresponding curve length.
Owner:JIANGSU UNIV

Factory intelligent scheduling method

ActiveCN105302096ARealize human-computer friendly interactive application and experienceReal, timely and reliable transmissionTotal factory controlProgramme total factory controlSmart transducerIntelligent sensor
The invention discloses a factory intelligent scheduling method which mainly comprises the following steps that equipment state information and factory environmental information are acquired via intelligent sensors; the equipment state information and the environmental information are respectively transmitted to corresponding PLC data acquisition stations; each PLC data acquisition station divides data into flow scheduling record data, key equipment control record data, equipment operation state data and key technological index data to be uploaded to a data center through data preprocessing; the data center performs extraction of knowledge rules so as to obtain a knowledge rule base formed by flow scheduling rules, equipment control rules and abnormity processing rules; and the corresponding rules are respectively read via an equipment intelligent control algorithm and a flow intelligent scheduling algorithm so that optimized configuration and scheduling of resources in an intelligent factory can be realized. Upgrading and reconstruction of conventional factory production modes can be realized so that production efficiency can be enhanced, production energy consumption can be reduced, environmental pollution can be reduced and production cost can be saved, and thus green production can be truly realized.
Owner:HUNAN CHAIRMAN IOT INFORMATION TECH CO LTD

Load forecasting method for electric vehicle

The invention provides a load forecasting method for an electric vehicle. The load forecasting method comprises the following steps: classifying influence factors for charging power of the electric vehicle and modeling the influence factors; confirming the influence factors for the charging power of the electric vehicle and adopting a Monte-Carlo simulation method for forecasting the charging power of a single electric vehicle in each time period per day under different influence factors; confirming the quantity of different living spaces and the quantity of electric vehicles contained in each living space, acquiring the charging power of the electric vehicle group charged in each living space in each time period per day according to the summation of the charging power of the single electric vehicle in each time period per day under different influence factors, and superposing, thereby acquiring the charging load of the whole electric vehicle group in each time period per day. According to the load forecasting method, the research is respectively performed for the factors, such as user behavior, charging modes, power battery characteristics, permeability and electrovalence, the influences of all the factors on the charging power characteristics of the electric vehicle are confirmed, and the expectation value of the charging power is forecasted.
Owner:STATE GRID CORP OF CHINA +3

Automated operating device for storage and verification of electric energy meter of electric power system and operating method thereof

The invention discloses an automated operating device for storage and verification of an electric energy meter of an electric power system and an operating method thereof. The automated operating device comprises an intelligent warehousing system, an RFID (radio frequency identification) property recognition system and a full-automatic verification assembly line, wherein the intelligent warehousing system comprises a high level three-dimensional good shelf and a physical distribution transport system, the RFID property recognition system comprises a radio frequency chip arranged on the electric energy meter to be verified and a radio frequency read device arranged in the intelligent warehousing system, the full-automatic verification assembly line comprises a system bus and a system branch line, the system bus is combined by modularized units which are connected with each other in series, and the system branch line comprises a plurality of verification branch lines which are connected in parallel. The automated operating device for storage and verification of the electric energy meter of the electric power system and the operating method have the advantages of realizing automated storage and verification of the newly purchased electric energy meter from the process of warehousing and verification to the process of delivery, and improving intelligent management level in metering storage and verifying production.
Owner:STATE GRID CORP OF CHINA +1

A kind of method for preparing magnesium-lithium alloy coating by precursor polymer

The invention provides a preparation method of a magnesium-lithium alloy surface coating. Using ceramic precursor polymers such as polysilazane, polycarbosilane and polysiloxane as the base material, with fillers such as B4C powder, SiC powder, SiO2 powder, Al2O3 powder and a small amount of additives, the preparation is carried out as follows: 1. Add a certain amount of fillers and additives to the precursor solution, and mix it in a ball mill to form a uniform slurry; 2. Apply the slurry to the surface of the treated magnesium-lithium alloy by brushing or spraying; 3. Put the Put the painted sample into a nitrogen or vacuum furnace, and cure it at 150°C to 200°C for 0.5 to 2 hours; 4. Brush (or spray) and cure the sample to obtain a reinforced coating . The present invention forms a high polymer with a three-dimensional network through the cross-linking reaction of the precursor molecules, and forms a dense coating on the surface of the magnesium-lithium alloy through the addition of fillers. The coating has excellent corrosion resistance and corrosion resistance. Grinding and heat resistance and other properties. The invention is an ideal method for preparing the magnesium-lithium alloy coating with low cost and high benefit, and broadens the application of the magnesium-lithium alloy in the fields of aerospace, automobile, electronics and the like.
Owner:JIAMUSI UNIVERSITY

Passive energy-saving reverse design system and method for high-rise building

PendingCN111291442AEmbody pioneeringReflect forward-lookingGeometric CADDesign optimisation/simulationControl engineeringBuilding design
The invention belongs to the technical field of building indoor environment design, and discloses a passive energy-saving reverse design system and design method for a high-rise housing, and the method comprises the steps: determining a design parameter variable and a design target according to a building design type; analyzing the influence of different factors on the thermal environment and theenergy consumption condition of the building by utilizing the test data; analyzing influence rules of passive factors on building thermal environment and energy consumption under different combinationconditions by adopting a computer simulation method in combination with the building information model; determining influence characteristics and value ranges of different passive factors on buildingenergy consumption; establishing a rapid prediction model to analyze the influence relationship of the high-sensitivity parameters on the building thermal environment and energy consumption; obtaining a design scheme solution set meeting a target requirement based on the rapid prediction model; and establishing a multi-objective optimization model, carrying out data fitting, and outputting a passive energy-saving strategy of the high-rise residence. According to the method, the reverse design convergence is ensured, and meanwhile, the reverse design calculated amount is reduced by 40%.
Owner:HUBEI UNIV OF TECH

A method for planning a local path of a water surface unmanned ship

The invention discloses a method for planning a local path of a water surface unmanned ship. The method comprises the following steps: acquiring water surface image data of an unmanned ship operationenvironment and marking the water surface image data; Training an image semantic segmentation model and an ACF detector, and enabling the model to converge and store model parameters through continuous iteration; Performing pixel-level classification on the water surface image by using an image semantic segmentation model to obtain a water surface boundary line; Extracting an area where a water surface obstacle exists, and identifying the water surface obstacle by adopting an aggregation channel characteristic algorithm; Projecting the phase plane where the water surface image is located to the driving horizontal plane of the unmanned ship, estimating the water surface boundary line and the actual direction and distance of a water surface obstacle, and constructing an obstacle avoidance environment model of the unmanned ship; Importing the water surface obstacle data into a VFH * local obstacle avoidance algorithm to obtain a current feasible direction of the unmanned ship; According to the invention, the obstacle is subjected to feature recognition, effective extraction of water surface image information is realized, a reasonable local path planning strategy is obtained, and the obstacle avoidance requirement of the unmanned ship is met.
Owner:SOUTH CHINA UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products