The invention relates to the technical field of cable-stayed bridge main
tower construction, in particular to a semi-
floating system cable-stayed bridge main
tower construction technology. The technical problems that in the prior art, concrete is prone to
cracking, a mode of fully laying a support is adopted for construction of a cross beam, the disassembly and
assembly difficulty is large, and the support is prone to deformation are solved through the semi-
floating system cable-stayed bridge main
tower construction technology. According to the technical scheme, the semi-
floating system cable-stayed bridge main tower construction technology comprises the following steps that S1, a lower tower column is constructed; s2, cross beam construction; s3, construction of an upper tower column; and S4, construction of the cableway
pipe. In order to prevent large-volume concrete temperature cracks in the construction period, control the temperature of the large-volume concrete temperature cracks, reduce
internal stress caused by temperature change to the maximum extent and prevent the cracks and serious structural damage, a
supporting system combining the pre-buried brackets and the steel
pipe columns is adopted for construction of the cross beams, and compared with a fully-laid support, the construction efficiency is improved. The support is small in elastic and
inelastic deformation and easy to construct and control.