Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

34results about How to "Easy construction control" patented technology

Unsaturated polyether monomer, preparation method and application of unsaturated polyether monomer, and polymer prepared thereby

The invention relates to the technical field of concrete admixtures and in particular relates to an unsaturated polyether monomer, a preparation method and application of the unsaturated polyether monomer, and a polymer prepared thereby. According to the structural design of introducing glycidyl ether into hydrophobic blocks, a certain amount of hydrophobic units and hydrophobic groups are introduced and controlled in a carboxylic copolymer molecular structure, so that the viscidity of a cement-based material is reduced under the action of a water reducing agent, and the dispersion property of the water reducing agent and slump retaining performance are improved. The unsaturated polyether monomer disclosed by the invention comprises multiple polymerization units, and has high double bond retention rate and excellent polymerization activity; by controlling the reaction conditions, the main chain and side chains of the product can be subjected to accurate design at different positions and lengths, so that the prepared water reducing agent is rich in product structure and is slightly influenced by factors such as high-temperature environment change, material quality fluctuation and the like, the concrete workability and high slump retaining performance are maintained, and convenience is brought to production and transportation and construction control.
Owner:联泓(江苏)新材料研究院有限公司

Novel miniature pile construction method

InactiveCN101424081AEasy to budget and final accountsSave the amount of pile materialBulkheads/pilesUltimate tensile strengthGuide tube
The invention relates to a method for constructing a novel mini-pile, which comprises the following steps: step one, using a drilling machine to form drill holes of which the diameter is between 0.25 and 0.4 meter on a groundwork; step two, pouring clear water in the drill holes through a hollow drill pipe of the drilling machine to perform a primary hole cleaning; step three, lifting out the drill pipe and putting reinforcing cages and pouring guide tubes into the drill holes; step four, pouring clear water into the drill holes through the pouring guide tubes to perform a secondary hole cleaning; and step five, pouring prepared fine gravel concrete into the drill holes through the pouring guide tubes until the fine gravel concrete pours out of the drilling holes so as to form the mini-pile of which the diameter is between 0.25 and 0.4 meter. The method adopts a mode of directly pouring the fine gravel concrete to form the mini-pile, thereby saving pile-making materials, facilitating engineering budget and final account and benefiting the popularization and the application of the mini-pile; besides, the method is convenient to control the pile body strength of the mini-pile so as to be advantageous for improving the pile body strength and the bearing capacity of the mini-pile.
Owner:CHINA ELECTRIC POWER RES INST

Flocculating agent for cement high pressure jet grouting and preparation method and application thereof

The invention discloses a flocculating agent for cement high pressure jet grouting and preparation method and application thereof. The flocculating agent is composed of konjac glucomannan, carbonate, rheological agent, dispersing agent, early strength agent and water by uniform stirring, distillation and smashing, and the weight ratio of the konjac glucomannan, carbonate, rheological agent, dispersing agent and early strength agent is 35-45: 22-28: 8-12: 13-17: 8-12; the preparation thereof includes the steps: raw material weighing and fully dissolution, mixed slurry confecting and distillation, spray drying, smashing and sieving; and the application thereof includes the steps: admixture determination, flocculating agent cement slurry confecting and slurry grouting completing by utilizing high pressure jet grouting process. The invention has simple preparation step, low cost and simple and convenient use and has no harm on human body, application in high pressure jet grouting construction is simple and convenient and processing effect is good, and the problems that pure cement slurry has poor adhesion, high cement slurry drain, high construction cost and influence on construction progress existed in high pressure jet impermeable grouting can be solved.
Owner:SINOHYRDO ENG BUREAU 3 CO LTD

Automatic spray conduit system and installation method thereof

The invention relates to an automatic spraying pipeline system, which can reduce the installation difficulty of the pipeline and independently carry out construction with an easy control over the construction, thus guaranteeing the construction period of the system and the installation quality of the pipeline system. The invention also provides an installation method of the automatic spraying pipeline system. The automatic spraying pipeline system comprises a main pipeline, a stem pipeline, a fire-fighting hose, fittings fixed on a keel and a shower nozzle, and is characterized in that: the main pipeline and the stem pipeline are arranged inside a roof truss layer above a static pressure box; one end of the fire-fighting hose is connected with the stem pipeline and the other end is communicated with a branch pipeline through bends and short tubes; the short tubes pass through the roof of the static pressure box; the other end of the branch pipeline is connected and communicated with the shower nozzle fixed on the keel. When in installation, the main pipeline and the stem pipeline inside the roof truss layer above the static pressure box are installed at a certain place; the fire-fighting hose is installed with one end being connected with the stem pipeline; the stem pipeline is installed at the place and is communicated with the other end of the fire-fighting hose through the short tubes and the bends; connectors fixed on the keel are installed and a FFU keel is connected with the branch pipeline through the connectors of the keel; the air pressure and the water pressure of regional pipelines are tested; the shower nozzle is installed.
Owner:CHINA ELECTRONICS SYST ENG NO 2 CONSTR

Karst water guiding device and method

The invention discloses a karst water guiding device and method. The karst water guiding device comprises a water collection mechanism, a water guiding mechanism and a water drainage mechanism. The water collection mechanism is arranged on one side of an underground building. One end of the water guiding mechanism is communicated with the water collection mechanism, and the other end of water guiding mechanism is communicated with the water drainage mechanism. The water guiding mechanism is arranged underneath the underground building. The water drainage mechanism is arranged at the downstream of a karst water channel. The karst water guiding device and method have the advantages that the karst water guiding device is simple in design, convenient to construct and control, capable of taking full advantage of terrain and karst water natural channels and easy to apply and popularize within a large area; the karst water guiding device and method can effectively solve the karst geology problem of the underground building during excavation and lower the impact and corrosion effects on the side walls of the underground building by karst water during operation; besides, connection between the upstream and the downstream of the karst water is guaranteed, and economic benefits and social benefits are obvious.
Owner:JINAN RAILWAY TRANSPORT GRP CO LTD

Stamping device civil engineering installation level control device and installing method

The invention relates to a stamping device civil engineering installation level control device and belongs to the technical field of machine tool equipment. The stamping device civil engineering installation level control device comprises a support embedded plate provided with a grouting hole and a plug welding hole, a leveling anchor bar and a fixing anchor bar, wherein the leveling anchor bar and the fixing anchor bar are welded in the plug welding hole. The invention further discloses an installing method. The installing method comprises the steps of pre-embedding the leveling anchor bar and the fixing anchor bar in concrete and adjusting the leveling anchor bar to be horizontal; aligning the plug welding hole in the support embedded plate to the leveling anchor bar and the fixing anchor bar, placing the support embedded plate, reserving a concrete to-be-cast space under the support embedded plate and adjusting the leveling anchor bar to be horizontal with the support embedded plate; performing plug welding to the support embedded plate, the leveling anchor bar and the fixing anchor bar and cutting off and grinding the portions of the upper end faces of the leveling anchor bar and the fixing anchor bar exposing out of the support embedded plate to be smooth; pouring concrete into the grouting hole in the support embedded plate and filling up the concrete to-be-cast space reserved under the support embedded plate. The design method is clear and definite, the construction control is simple and convenient, and construction faults can be effectively reduced.
Owner:DONGFENG DESIGN INST

Slope hydraulic self-propelled concealed-rail drag mold

ActiveCN102720162ASolve problems limited by slope slopeFast constructionCoastlines protectionHydraulic pumpEngineering
The invention provides a slope hydraulic self-propelled concealed-rail drag mold, which comprises travel beams, a balance beam, a template system, a working platform, a hydraulic system and the like, wherein each travel beam consists of a crossbeam, a front sliding seat, a back sliding seat, adjusting screws and a cylinder block; the front sliding seat is in rigid connection with the crossbeam, and the back sliding seat is hinged with the crossbeam; the template system consists of a template, a bearing beam and a template system support frame; the bearing beam is parallel to the balance beam; two ends below the bearing beam and the balance beam are respectively provided with a travel beam in the vertical direction; the rear end of the template is provided with the template system support frame; the working platform is parallel to a rail, and is obliquely tensioned on the template system support frame through a spiral lock button; the hydraulic system mainly comprises a hydraulic pump station, advancing cylinders, a hydraulic pipeline and the like; the hydraulic pump station is arranged in the middle of the bearing beam; and an advancing cylinder is arranged below each of two travel beams. The drag mold is not limited to the slope gradient, can ensure that concrete can be continuously poured in large cube amount and large area, and ensures high pouring speed and good quality.
Owner:SINOHYDRO BUREAU 7 CO LTD

Transverse crack treatment method for roller compacted concrete dam

The invention relates to the field of concrete defect treatment of hydraulic structures, in particular to a transverse crack treatment method for a roller compacted concrete dam. The method comprisesthe following steps of crack surface blocking, crack grouting and drilling, crack grouting and the like. A crack is blocked by using a grouting material to prevent a condition that leakage of a dam body exceeds a design standard as a result of dam leakage as stored water in a reservoir enters a roller compacted concrete crack under the action of a water head in front of the dam after the dam stores water and to prevent probability of displacement of the dam body as water leakage of the interlayer crack reduces the interlayer friction resistance of the roller compacted concrete. According to ajoint grouting system remedy principle, a slurry diffusing area is controlled by arranging a slurry outlet box for calculation so as to arrange a grouting system, grouting loops are arranged from bottom to top, slurry is fed in the lower grouting loop, the upper grouting loop is used to return slurry and exhaust, and the joint grouting system between two grouting loops is formed successively tilla crack area is integrally poured from bottom to top, so that it is ensured that the slurry is diffused uniformly when pouring the crack surface and it is beneficial to exhaust.
Owner:CHINA HYDROPOWER ELEVENTH ENG BUREAU ZHENGZHOU CO LTD +1

Self-compacting concrete prepared from modified ceramic polishing powder and preparation method of self-compacting concrete

The invention relates to the technical field of building materials, in particular to self-compacting concrete prepared from modified ceramic polishing powder and a preparation method of the self-compacting concrete. The self-compacting concrete is prepared from the following raw materials: cement, modified ceramic polishing powder, fly ash, coarse aggregate, artificial sand, water and a polycarboxylic acid high-performance water reducing agent, the modified ceramic polishing powder is obtained by sequentially carrying out soaking treatment on ceramic polishing fine powder through a coupling agent solution and soaking treatment through a coupling agent solution added with cellulose ether and an organic silicon defoaming agent. The specific surface area of the ceramic polishing fine powder is 800-830 m < 2 >/kg. The self-compacting concrete is doped with the modified ceramic polishing powder, so that the compactness of the concrete can be effectively improved, the flowability and the water-retaining property of the self-compacting concrete can also be improved, more obviously, the later strength of the concrete is better improved, and the problem of shortage of mineral admixture resources can be effectively solved.
Owner:XIAMEN TIANRUN JINLONG BUILDING MATERIAL +1

Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction

The invention relates to a jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction. The method comprises the following ten steps: 1, selecting a precompaction field; 2, assembling the hanging basket girders; 3, symmetrically putting the two hanging basket girders on four wood pads; 4, prefixing rear anchor points; 5, assembling a middle fulcrum point block; 6, mounting a hanging basket loading system; 7, measuring the relative position size of the two hanging basket girders before loading; 8, loading and measuring the relative position size of the two hanging basket girders; 9, unloading and measuring the relative position size of the two hanging basket girders; and 10, calculating and analyzing according to measurement data. The method has the advantages that the precompaction on bridge can be substituted, thus heavy workload for suspending sandbags can be avoided; the precompaction work efficiency is effectively quickened so as to save massive precompaction construction time; load can be applied by the jack, and precompaction data can be accurately controlled; and the precompaction process and observation process of the hanging basket are performed in the field with high safety and strong controllability.
Owner:THE 4TH CONSTR ENG CO LTD OF CHINA RAILWAY NO 4 ENG GRP

Construction method for high-rise housing novel building system under general-control construction period

The invention discloses a construction method for a high-rise housing novel building system under the general-control construction period. The construction method comprises the following steps that foundation construction is conducted; a foundation under layer is constructed till the foundation under layer reaches the plus-or-minus-zero height; an N-layer major structural layer is constructed;an (N-1)-layer template-dismounting layer is constructed; an (N-2)-layer roof-propping water-stopping layer is constructed; an (N-3)-layer inner wallboard mounting layer is constructed; an (N-4)-layer ceiling putty layer is constructed; an (N-5)-layer ceiling suspending layer is constructed; an (N-6)-layer kitchen and bath brick laying layer is constructed; an (N-7)-layer hall and room brick laying layer is constructed; an (N-8)-layer windowsill mounting layer is constructed; an (N-9)-layer wall surface putty layer layer is constructed; an (N-10)-layerindoor door mounting layer is constructed; an (N-11)-layer component mounting layer is constructed; an (N-12)-layer wood floor laying layer is constructed; and an (N-13)-layer clean-keeping land-clearing layer is constructed. According to the construction method for the high-rise housing novel building system under the general-control construction period, compared with a traditional construction method, the construction period can be shortened while the construction quality is guaranteed, the construction method is more suitable for the building construction practice under a current novel building system, all-stage working periods in the whole building process of a high-rise housing are reflected in time, and the construction method has perspectiveness within the industry and is high in practicability.
Owner:佛山市万科置业有限公司 +1

Flocculating agent for cement high pressure jet grouting and preparation method and application thereof

The invention discloses a flocculating agent for cement high pressure jet grouting and preparation method and application thereof. The flocculating agent is composed of konjac glucomannan, carbonate, rheological agent, dispersing agent, early strength agent and water by uniform stirring, distillation and smashing, and the weight ratio of the konjac glucomannan, carbonate, rheological agent, dispersing agent and early strength agent is 35-45: 22-28: 8-12: 13-17: 8-12; the preparation thereof includes the steps: raw material weighing and fully dissolution, mixed slurry confecting and distillation, spray drying, smashing and sieving; and the application thereof includes the steps: admixture determination, flocculating agent cement slurry confecting and slurry grouting completing by utilizinghigh pressure jet grouting process. The invention has simple preparation step, low cost and simple and convenient use and has no harm on human body, application in high pressure jet grouting construction is simple and convenient and processing effect is good, and the problems that pure cement slurry has poor adhesion, high cement slurry drain, high construction cost and influence on construction progress existed in high pressure jet impermeable grouting can be solved.
Owner:SINOHYRDO ENG BUREAU 3 CO LTD

Novel miniature pile construction method

InactiveCN101424081BEasy to budget and final accountsSave the amount of pile materialBulkheads/pilesUltimate tensile strengthGuide tube
The invention relates to a method for constructing a novel mini-pile, which comprises the following steps: step one, using a drilling machine to form drill holes of which the diameter is between 0.25 and 0.4 meter on a groundwork; step two, pouring clear water in the drill holes through a hollow drill pipe of the drilling machine to perform a primary hole cleaning; step three, lifting out the drill pipe and putting reinforcing cages and pouring guide tubes into the drill holes; step four, pouring clear water into the drill holes through the pouring guide tubes to perform a secondary hole cleaning; and step five, pouring prepared fine gravel concrete into the drill holes through the pouring guide tubes until the fine gravel concrete pours out of the drilling holes so as to form the mini-pile of which the diameter is between 0.25 and 0.4 meter. The method adopts a mode of directly pouring the fine gravel concrete to form the mini-pile, thereby saving pile-making materials, facilitating engineering budget and final account and benefiting the popularization and the application of the mini-pile; besides, the method is convenient to control the pile body strength of the mini-pile so as to be advantageous for improving the pile body strength and the bearing capacity of the mini-pile.
Owner:CHINA ELECTRIC POWER RES INST

Automatic spray conduit system and installation method thereof

The invention relates to an automatic spraying pipeline system, which can reduce the installation difficulty of the pipeline and independently carry out construction with an easy control over the construction, thus guaranteeing the construction period of the system and the installation quality of the pipeline system. The invention also provides an installation method of the automatic spraying pipeline system. The automatic spraying pipeline system comprises a main pipeline, a stem pipeline, a fire-fighting hose, fittings fixed on a keel and a shower nozzle, and is characterized in that: the main pipeline and the stem pipeline are arranged inside a roof truss layer above a static pressure box; one end of the fire-fighting hose is connected with the stem pipeline and the other end is communicated with a branch pipeline through bends and short tubes; the short tubes pass through the roof of the static pressure box; the other end of the branch pipeline is connected and communicated with the shower nozzle fixed on the keel. When in installation, the main pipeline and the stem pipeline inside the roof truss layer above the static pressure box are installed at a certain place; the fire-fighting hose is installed with one end being connected with the stem pipeline; the stem pipeline is installed at the place and is communicated with the other end of the fire-fighting hose through the short tubes and the bends; connectors fixed on the keel are installed and a FFU keel is connected with the branch pipeline through the connectors of the keel; the air pressure and the water pressure of regional pipelines are tested; the shower nozzle is installed.
Owner:CHINA ELECTRONICS SYST ENG NO 2 CONSTR

A kind of unsaturated polyether monomer and its preparation method, application and prepared polymer

The invention relates to the technical field of concrete admixtures and in particular relates to an unsaturated polyether monomer, a preparation method and application of the unsaturated polyether monomer, and a polymer prepared thereby. According to the structural design of introducing glycidyl ether into hydrophobic blocks, a certain amount of hydrophobic units and hydrophobic groups are introduced and controlled in a carboxylic copolymer molecular structure, so that the viscidity of a cement-based material is reduced under the action of a water reducing agent, and the dispersion property of the water reducing agent and slump retaining performance are improved. The unsaturated polyether monomer disclosed by the invention comprises multiple polymerization units, and has high double bond retention rate and excellent polymerization activity; by controlling the reaction conditions, the main chain and side chains of the product can be subjected to accurate design at different positions and lengths, so that the prepared water reducing agent is rich in product structure and is slightly influenced by factors such as high-temperature environment change, material quality fluctuation and the like, the concrete workability and high slump retaining performance are maintained, and convenience is brought to production and transportation and construction control.
Owner:联泓(江苏)新材料研究院有限公司

A kind of in-situ construction method of stepped concrete

The invention discloses a step-shaped concrete casting mold assembly and a cast-in-situ construction method, comprising: cleaning the base surface → supporting the side form → pouring the concrete at the lower part of the step → laying a movable die and clamping → pouring the upper part of the step Concrete→Remove the movable die→Tighten the surface of the lower part of the steps→Tighten the surface of the upper part→Conservation→Remove the side formwork and continue the maintenance. Since the present invention adopts the dynamic operation process of "installation later and removal first" of the movable die and the form support method that the 45° contact surface between the movable die and the upper inner mold can be combined and separated, the inner side of the cast-in-place concrete step is completely solved. There is a problem with stencil imprints on the surface. The overall structure of the steps casted by the present invention is complete, without cold joints, and the internal quality meets the design standards; the surface has no template marks, no cracks, no bubbles or spots, pockmarks, etc., and the appearance quality meets the requirements of the specifications, and can be applied to various The cast-in-place stepped concrete project has significant practical significance and good social benefits.
Owner:卜群惠

Double-wall steel hanging box cofferdam provided with rapid mounting and dismounting double lock catch devices

A double-wall steel hanging box cofferdam provided with rapid mounting and dismounting double lock catch devices is characterized in that a first C-shaped pipe and a second C-shaped pipe are welded toa second box wall board of a first steel hanging box, and a third C-shaped pipe and a fourth C-shaped pipe are welded to the box wall of a second steel hanging box; triangular stiffening plates the same in structure are welded to the first C-shaped pipe, the second C-shaped pipe, the third C-shaped pipe and the fourth C-shaped pipe correspondingly; two end wing plates of first joist steel and second joist steel are arranged in the first C-shaped pipe, the second C-shaped pipe, the third C-shaped pipe and the fourth C-shaped pipe correspondingly; first long-strip-shaped stiffening plates are welded to the first C-shaped pipe and the third C-shaped pipe, and second long-strip-shaped stiffening plates are welded to the second C-shaped pipe and the fourth C-shaped pipe; the first lock catch device and the second lock catch device are arranged on the front-back outer walls of the first steel hanging box and the second steel hanging box correspondingly, the first steel hanging box and the second steel hanging box are installed and fastened together, and the double-wall steel hanging box cofferdam provided with the rapid mounting and dismounting double lock catch devices is formed.
Owner:NO 1 ENG CO LTD OF CR11BG +1

Slope hydraulic self-propelled concealed-rail drag mold

ActiveCN102720162BSolve problems limited by slope slopeFast constructionCoastlines protectionHydraulic pumpEngineering
The invention provides a slope hydraulic self-propelled concealed-rail drag mold, which comprises travel beams, a balance beam, a template system, a working platform, a hydraulic system and the like, wherein each travel beam consists of a crossbeam, a front sliding seat, a back sliding seat, adjusting screws and a cylinder block; the front sliding seat is in rigid connection with the crossbeam, and the back sliding seat is hinged with the crossbeam; the template system consists of a template, a bearing beam and a template system support frame; the bearing beam is parallel to the balance beam; two ends below the bearing beam and the balance beam are respectively provided with a travel beam in the vertical direction; the rear end of the template is provided with the template system support frame; the working platform is parallel to a rail, and is obliquely tensioned on the template system support frame through a spiral lock button; the hydraulic system mainly comprises a hydraulic pump station, advancing cylinders, a hydraulic pipeline and the like; the hydraulic pump station is arranged in the middle of the bearing beam; and an advancing cylinder is arranged below each of two travel beams. The drag mold is not limited to the slope gradient, can ensure that concrete can be continuously poured in large cube amount and large area, and ensures high pouring speed and good quality.
Owner:中国水利水电第七工程局有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products