BIM-based engineering design and management system

An engineering design and management system technology, applied in computing, data processing applications, electrical and digital data processing, etc., can solve problems such as low efficiency, inconvenient information processing and utilization, and ensure management quality, management and operation are convenient, intuitive, and economical. The effect of engineering costs

Inactive Publication Date: 2018-08-10
深圳群伦项目管理有限公司
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a BIM-based engineering design and management system to solve the problems of low efficiency and inconvenient information processing and utilization in the existing manual engineering information management mode

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based engineering design and management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0027] like figure 1 The BIM-based engineering design and management system shown includes data acquisition module, data processing module, central processing unit, front-end intelligent equipment and background database automatic update module; front-end intelligent equipment includes BIM building information model module, engineering design management module, Project log information management module, progress management module and 3D effect generation module;

[0028] The data acquisition module is used to collect real-time image data of the construction site; the image data acquisition method of the data acquisition module is a tablet computer, a mobile phone or a camera.

[0029] The data processing module is used to receive the image data uploaded by the data acquisition module, perform mathematical function operations on the d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention discloses a BIM-based engineering design and management system. The system comprises a data acquisition module, a data processing module, a central processing unit, a front-end intelligent device and a background database automatic updating module. The front-end intelligent device comprises a BIM building information model module, an engineering design management module, a project log information management module, a schedule management module and a three-dimensional effect generation module. The beneficial effects of the system disclosed by the present invention are that: the rationality of the design scheme is improved, and the construction rework caused by the design change is reduced, so that the engineering cost is saved; and in addition, there is no need for theon-site management personnel to carry a lot of drawings and other materials, so that the progress for processing on-site problems can be effectively tracked, and the project constructability can be intuitively understood.

Description

technical field [0001] The present invention relates to the technical field of BIM, and specifically refers to a BIM-based engineering design and management system. Background technique [0002] BIM Building Information Modeling is a technical aspect promoted by the International Association of Architects. As a complete information carrier of construction projects, BIM is an innovative method of architectural design, construction and management. Its main feature is that it can continuously and instantly provide high-quality, consistent and reliable project design scale, progress and cost information. Architects, structural engineers and the whole process management of engineering projects realize seamless connection and share data and information through the BIM collaborative platform. Using BIM technology to improve refined management and reduce energy consumption and resource consumption, BIM has become an important technical means for the whole process management of con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q50/08
CPCG06Q50/08G06F30/13
Inventor 谭文华郭诚茹
Owner 深圳群伦项目管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products