The invention relates to a post-construction method of a
pipe-jacking receiving well, which comprises the following steps: step S101,
pipe-jacking construction: performing
pipe-jacking construction to a design position of the receiving well; s103, grouting reinforcement and
pile foundation construction are conducted, specifically, a first pipe joint fixedly installed at the rear end of the pipe jacking
machine head is a connecting pipe joint, and grouting reinforcement is conducted on a soil body on the
peripheral side of the connecting pipe joint; constructing a plurality of
pile foundations, wherein one
pile foundation penetrates through the connecting pipe joint; and S105, receiving well construction is conducted, specifically, the receiving wells are constructed at the multiple pile foundations. According to the post-construction method, construction of the starting well is conducted firstly, then pipe jacking construction is conducted, projects such as surrounding important buildings, construction under construction, high-speed railway construction and civil land expropriation and demolition can be traversed firstly, and finally receiving well construction is conducted, so that the working efficiency of pipe jacking construction can be improved, and synchronous construction with surrounding special buildings can be achieved; in addition, the connection between the jacking pipe and the receiving well can be improved, the overall stability between the jacking pipe and the receiving well is improved, and the reasonability and feasibility of sequential construction between the jacking pipe and the receiving well are improved.