Hard cutting type construction method of secant pile in karst region
A construction method and technology of occlusal piles, applied to sheet pile walls, foundation structure engineering, buildings, etc., to achieve the effects of high overall rigidity, high construction efficiency, and short pile-forming time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0024] Refer to attached figure 1 and 2 , this embodiment provides a hard-cut occlusal pile construction method in karst areas. The specific construction process is as follows: construction preparation - pile position setting - guide wall construction - drilling rig in place - drilling, ballasting - hole cleaning - hole forming inspection - Drilling rig shifting - Reinforcement skeleton placement - Preparation before concrete pouring - Concrete pouring - Pulling out casing - Pile head chisel cleaning - Pile body inspection - Crown beam construction.
[0025] Process principle: such as figure 1 As shown, rotary drilling is used to construct occlusal piles in karst areas by hard cutting, that is, A-sequence piles (C25 plain concrete piles) are constructed first, and B-sequence piles (C35 reinforced concrete piles) are constructed after the concrete of A-sequence piles is finally set. The plain concrete piles and reinforced concrete piles are interlocked to form the pile wall o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com