Buried liftable dual-charge charging pile for easy installation and construction
A charging pile, buried technology, applied in the field of buried double charging piles that can be lifted and lowered, can solve the problem of increasing construction complexity and construction cost, increasing the difficulty of installation pit excavation, excavating to about two meters, and even deeper issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0032] refer to Figure 1-5 , the present invention provides an underground liftable dual-charge charging pile that is convenient for installation and construction. The underground liftable double-charge charging pile that is convenient for installation and construction includes a base 20 and a pile body 10, and an installation pit is opened on the foundation 1. 5. The base 20 is fixedly installed in the installation pit 5. The bottom of one side of the pile body 10 is rotatably connected to the upper part of the inner wall of the base 20. The base 20 is used to install the pile body 10 and accommodate the pile body 10 turned into it . In this embodiment, the base 20 is connected to the foundation 1 through expansion screws.
[0033] The pile body has a working state and a non-working stowed state. When the pile body is turned from the base 20 toward the ground to a vertical state, the pile body is in the working state, that is, in a use state, and can provide charging servic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com