Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for detecting the risk rate of high arch dam construction in the early-middle period

A detection method and construction diversion technology, applied in the direction of instrumentation, geometric CAD, calculation, etc., can solve the problems that it is difficult to apply diversion to high arch dam construction, cannot reflect the construction mechanism of high arch dam and the pouring change process, and is difficult to be close to engineering reality, etc.

Active Publication Date: 2018-12-07
POWERCHINA CHENGDU ENG
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

These models mainly explore the risk of water retention and flood protection in the initial stage of hydropower project construction, but it is difficult to fully reflect the diversion risk during the entire construction period
With the construction of high dam and large reservoir hydropower projects, the water retaining risk model of high rockfill dams established by Humberto [2013], Zhang Chao [2014] and Liu Lian [2016] takes into account the change of dam filling elevation , but the construction mechanism of high rockfill dams is completely different from that of high arch dams, so it is difficult to apply to the construction diversion of high arch dams; Li Zongkun et al. [2015] constructed a flood risk model during the construction period of earth-rockfill dams, which took into account the construction progress randomness, but the random parameters of the construction schedule are highly subjective, and it is difficult to get close to the actual engineering
[0005] It can be seen that in the current existing research, the risk model can only reflect the risk of water retention and flood control in the initial diversion stage, thereby isolating the initial and mid-term diversion stages of construction, or cannot reflect the construction mechanism of high arch dams and the actual pouring process of the dam body , the risk model and analysis methods are difficult to meet the needs of high arch dam construction risk rate detection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for detecting the risk rate of high arch dam construction in the early-middle period
  • Method for detecting the risk rate of high arch dam construction in the early-middle period
  • Method for detecting the risk rate of high arch dam construction in the early-middle period

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0132] Taking the implementation of a high arch dam project in the upper reaches of the Jinsha River as an example, the dam type is a concrete double-curvature arch dam, and the maximum dam height is 217.0m. The hub building consists of three major systems: concrete hyperbolic arch dam, flood discharge and energy dissipation buildings, and water diversion and power generation buildings. The hub project is a first-class large (1) project, using a city gate-type diversion tunnel, and its operation runs through the early to middle stage of construction during the flood season. The initial diversion standard adopts the 20-year flood standard, and the medium-term diversion standard adopts the 100-year flood standard.

[0133] At the beginning of the design, four diversion tunnel design schemes were drafted, and the indicators of each scheme are shown in Table 1 below:

[0134] Table 1: Design indicators of diversion tunnel scheme

[0135] project

Number of bars - hol...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the diversion risk analysis technology of construction of hydraulic and hydroelectric engineering, and discloses a method for detecting the risk rate of high arch dam construction in the early-middle period, which features that the risk rate of high arch dam construction in the early-middle period is accurately and reasonably quantify, and the risk rate of high arch dam construction in the early-middle period is quantified to provide important theoretical basis for safety risk assessment, decision-making and distribution of diversion risk in flood season. The method includes the following steps: a, carrying out simulation analysis of the mid-term flood retardation and obtaining the data of the flood retardation; b, performing construction of a high arch dam mathematical model of medium-term diversion risk; c, carrying out parameter analysis on random factor of construction flood and diversion tunnel discharge capacity, and determining distribution parameters ofeach random factor; d, carrying out random dynamic simulation of flood level change process during flood control and flood season; e, carrying out calculation of the early-medium-term diversion riskrate of the high arch dam; f, conducting risk identification of diversion tunnel design scheme for high arch dam construction. The method is applicable to detection of the early-medium-term diversionrisk rate of the construction of the high arch dam.

Description

technical field [0001] The invention relates to a water conservancy and hydropower project construction diversion risk analysis technology, in particular to a method for detecting diversion risk rate in the early-middle stage of high arch dam construction. Background technique [0002] In the construction process of water conservancy and hydropower projects, construction diversion is one of the key links throughout the whole process of water conservancy and hydropower project construction. The power generation period of the unit, etc., affects the whole process of project construction. However, as a risky system, the construction diversion system will seriously affect the safety, progress and efficiency of the project itself, and may cause personal injury and property loss to the people downstream. [0003] The construction diversion of high arch dams in the canyon area has unique characteristics. The flood season stage is generally divided into initial diversion, mid-term ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/50
CPCG06F30/13G06F30/20Y02A10/40
Inventor 张超胡志根银登林付峥
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products