Integrated-mold fine-aggregate-concrete flashing construction method and waterproof maintenance device thereof
A technology of fine stone concrete and construction methods, which is applied to roofs, buildings, and roofs using sealed aggregates. Automation and intelligence, improving watering and maintenance efficiency, and avoiding pollution and erosion effects
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2019-01-08
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to an integral mold fine stone concrete flashing construction method and a waterproof maintenance device. Background technique
[0002] Flooding is a kind of waterproof technology in buildings. Generally speaking, it is to carry out waterproof treatment on the wall and roof, that is, at the intersection of all flat and vertical surfaces that need waterproof treatment. Roof flashing is an important structure of the roof. Many roof leaks are often caused by the failure of this structure. The construction quality of flashing is closely related to the elimination of roof leakage. Nowadays, there are four traditional flooding construction methods: stone flooding, stainless steel flanged flooding, PVC mold fine stone concrete flooding, and integral mold fine stone concrete flooding. For stone flooding, stone paving The method of construction, the demand for construction stone is large, the stone needs to be cut and polished according t...
Examples
Embodiment Construction
[0050] Such as Figure 1-2 Shown, be a kind of monolithic mold fine stone concrete flooding construction method of the present invention, comprise the following steps:
[0051] 1) Determine the construction plan:
[0052] According to the actual situation and on-site survey, the preliminary construction plan was determined, compiled and deliberated, and the final construction plan was obtained after improvement according to the relevant rectification suggestions. All have good construction elements to ensure that the construction plan is economically feasible, the process is reasonable, and it meets the design and set goals.
[0053] 2) Stakeout measurement:
[0054] a. Design the roofing construction process, the roofing construction process includes
[0055] ① Lay a 20 thick 1:3 cement mortar screed layer on the roof; ② Lay a 1.2 thick PET polymer waterproof membrane layer on the leveling layer; ③ Lay a 50 thick phenolic insulation layer on the waterproof membrane layer; ...