Coordinated dispatching method of thermoelectric power of integrated energy system based on regional heating network
A technology of integrated energy system and coordinated scheduling, which is applied in the field of coordinated scheduling of thermoelectric power of integrated energy system based on district heating network, can solve the adverse effects of coordinated scheduling of integrated energy system, affect system flexibility and economic benefits, and affect heating quality, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0084] A method for coordinated dispatching of thermoelectric power in an integrated energy system based on a district heating network, including the following steps:
[0085] S1, establishing a regional heating network model including nodes and hot water pipes, the establishment of the regional heating network model further includes:
[0086] S11, establishing the scheduling constraints of the district heating network model, the constraints include mass conservation constraints, mass flow constraints, pressure drop and electric pump power constraints, thermal power constraints, and heat source and heat exchange station constraints;
[0087] The mass conservation constraints are:
[0088]
[0089] in, Indicates the mass flow rate of the pipe segment i in the time period t, Represents the set of all pipe segments connected to node j, Θ in Represents the collection of all nodes;
[0090] The mass flow constraints are:
[0091]
[0092] in, and Respectively repre...
Embodiment 2
[0150] We use the modified multi-energy flow system based on an actual multi-energy system in Changchun as a case study. The structure diagram of the improved multi-energy flow system is shown in Figure 4 shown. The system consists of two cogeneration systems of different capacities, such as figure 1 as shown, figure 1 (a) is an integrated energy system structure, figure 1 (b) Cogeneration system structure, the difference is that cogeneration system No. 1 includes a 1.5MW fan, and cogeneration system No. 2 has no storage battery. The specific parameters of the two CHP systems are shown in Table 1. The district heating network has 2 heat source nodes, 25 heat exchange station nodes and 24 sink nodes. The scheduling duration is 24 hours, and the scheduling cycle is 1 hour, δ f = 1%, δ T =0.01°C, other parameters are shown in Table 2 and Table 3. In order to illustrate the performance and solution strategy of the proposed dispatching strategy, the operating results an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com