Wall-mounted draining anchor rod barricade structure and construction method thereof
A wall-mounted and retaining wall technology, applied in the field of geotechnical engineering, can solve problems such as the deterioration of rock and soil strength on bank slopes, affecting the safety of bridge pile foundations, and instability of slopes, so as to avoid reservoir water soaking, solve stability problems, The effect of reducing the degree of influence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] This embodiment discloses a wall-mounted drainage anchor retaining wall structure to solve the problems existing in the protection technology of bridge pile foundations in the banks and valleys of the drawdown zone of large reservoirs. see figure 1 , the retaining wall structure includes a longitudinal beam 4 embedded in the top of the bank slope, as well as a retaining wall 1 and an anchor rod 2 .
[0040] The retaining wall 1 is arranged on the water side of the bank slope. The retaining wall 1 includes a retaining wall body 101 . The two ends of the retaining wall body 101 along the direction of the bank slope extend a receiving portion 102 into the rock and soil body behind the wall. The function of the retaining wall 1 is to support the rock and soil mass behind the retaining wall and to seal the surface of the rock and soil mass. When the length of the retaining wall is too long, deformation joints can be provided in the retaining wall 1, and water-stop materia...
Embodiment 2
[0045] This embodiment provides a construction method for the wall-mounted drainage anchor retaining wall structure described in Embodiment 1, including the following steps:
[0046] 1) According to the geological survey data, determine the construction position of the retaining wall structure.
[0047] 2) Excavate and clean the rock and soil on the slope surface according to the design, and then select the appropriate construction method to construct the anchor 2 according to the designed anchor position, size, strength grade, etc., and ensure that the anchor 2 is exposed to a sufficient length of reinforced steel bars , so as to connect with retaining wall 1.
[0048] 3) Drainage holes are constructed in the rock and soil mass behind the wall, and drainage pipes 6 are pierced. Wherein, the drain pipe 6 is exposed to a certain length.
[0049]4) According to the designed retaining wall size, strength grade, etc., select an appropriate construction method to construct the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com