Temporary grounding wire management system for transmission line and operation method thereof

A technology of temporary grounding wire and management system, applied in the field of temporary grounding wire management system of transmission line, can solve the problems of unrecorded grounding wire, complicated line environment, wrongly connecting grounding wire, etc. strong effect

Inactive Publication Date: 2019-04-05
GUIZHOU POWER GRID CO LTD
View PDF9 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the characteristics of long spans, many points and wide areas, and mountains and mountains, it is often necessary to set up multiple sets of grounding wires when repairing the corresponding lines, and it usually takes a long time for many people to complete the removal of these grounding wires. , so in actual work there may be problems such as wrong connection, missed removal of the ground wire, etc.
In particular, the maintenance task of high-voltage lines is short and the line environment is complex. Once an accident or failure occurs, it will inevitably pose a serious threat to personal safety and power grid security.
At present, the connection or removal of grounding wires of transmission lines mainly depends on manual inspection and counting, and there is still a lack of effective technical means for the use and management of temporary grounding wires. Incorrect storage; Mistakenly boarded the tower and wrongly hung the ground wire; The hanging / removal of the ground wire was not recorded, which may lead to the missed removal of the ground wire;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary grounding wire management system for transmission line and operation method thereof
  • Temporary grounding wire management system for transmission line and operation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the preferred embodiments are only for illustrating the present invention, not for limiting the protection scope of the present invention.

[0031] Such as figure 1 As shown, a temporary grounding management system for transmission lines of the present invention includes a grounding management system host, a handheld device, and an intelligent grounding cabinet; the smart grounding cabinet and the grounding management system host use wireless Signal connection; both the host of the ground wire management system and the handheld device are connected to the public wireless communication network and connected by wireless signals.

[0032] The handheld device has all the functions of a smart phone and has the function of communicating with Beidou satellites. The handheld device runs dedicated line work ticket software.

[...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a temporary grounding wire management system for a transmission line and an operation method thereof, and belongs to the technical field of transmission engineering. The systemincludes a ground wire management system host, a handheld device and an intelligent ground wire cabinet. The intelligent ground wire cabinet is connected to the ground wire management system host byusing a wireless signal. The ground wire management system host and the handheld device are connected to a public wireless communication network and are connected by using a wireless signal. The handheld device has all the functions of a smart phone and has the function of communicating with Beidou satellites. The handheld device runs dedicated line work ticket software. The operation method is also provided. The system can standardize the temporary grounding line operation of the transmission line, mistaken tower climbing, wrong grounding wire hanging and missed grounding wire disassembly areprevented. The operation method is scientific and reasonable and has high applicability and a good effect.

Description

Technical field [0001] The invention relates to a temporary grounding line management system and operation method of a power transmission line, and belongs to the technical field of power transmission engineering. Background technique [0002] In order to ensure personal safety during the power outage construction and maintenance work of the transmission line, it is necessary for the construction personnel to connect temporary grounding wires at both ends of the construction section to prevent the reverse transmission and induction of electricity. Measures. However, because the power system transmission lines have the characteristics of long spans, wide points, and mountains and mountains, it is often necessary to set up multiple sets of grounding wires when repairing the corresponding lines, and removing these grounding wires usually requires a lot of people to operate for a long time. , So there may be problems such as mis-hanging and missing grounding wires in actual work. I...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J13/00H04W4/30H04B7/185G08C17/02
CPCH02J13/0075H04B7/1851H04W4/30G08C17/02Y04S40/126Y02E60/00
Inventor 丁志敏蒋德州陈舸田彬蒋友权邢晓敏李贻涛
Owner GUIZHOU POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products