Control resource group configuration method, base station, user equipment and computer readable medium
A technology for controlling resources and configuration methods, which is applied in the field of communication, can solve problems such as the inability to support the flexibility requirements of 5G scanning beams, and achieve the effect of monitoring and controlling resource groups
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0071] In the 5G system, synchronization signals and broadcast channels are sent in the form of synchronization signal blocks (SS-block), and the function of beam sweeping (Beam Sweeping) is introduced. A primary synchronization signal (Primary Synchronization Signal, PSS), a secondary synchronization signal (Secondary Synchronization Signal, SSS) and a physical broadcast channel (Physical Broadcast Channel, PBCH) are in a synchronization signal block. Each synchronization signal block can be regarded as a resource of a beam (analog domain) in the beam scanning process. Multiple sync signal blocks form a sync signal burst (SS-burst). The synchronization signal bursts form a synchronization signal burst set (SS-burst-set). The synchronization signal block is sent repeatedly on different beams, which is a beam scanning process. Through beam scanning training, the user equipment can perceive which beam receives the strongest signal.
[0072] The time domain positions of the L s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com